An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF) Opening Comments John Martin May 13-17, 2002

  2. IMDC Study Goals • Material which can be used as a basis for future study by the MAXIM team • Each Discipline suggests future studies, building on this week’s work • It may be only a small step from MAXIM Pathfinder for the full MAXIM • Determine if it is reasonable to call this a 2015 launch • It is reasonable to do this, pending authorization and sufficient money • Produce a life-cycle cost estimate • Provided both as a grass-roots estimate and a parametric estimate • Refine the mission profile (e.g., orbit analysis, etc.) as contained in the prework and opening presentation • Concepts for Phase 1 and Phase 2 have been augmented and refined • Terms “Mode 1” and “Mode 2” have been used in some places, but should be replaced with “Phase 1” and “Phase 2” in future work • Identify required “technology miracles” and performance drivers • Miracles do not appear needed • Technology developments needed for MAXIM are same as needed for several other future missions MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  3. These are Included in our “Standard” Work Package • Nice-looking mechanical diagrams, graphs and nice sketches showing results of the study • Included in the Mechanical presentation and supporting files • Graphs and other sketches • Included in many Discipline presentations • Disciplines cover these topics • MAXIM requirements that drive the subsystem being discussed • Subsystem configuration • Elements included (could be components, but great detail not expected) • Mass and cost estimates • Technologies required • Identify tall poles, if any (technology needed, but not likely to be developed without funding or other emphasis from MAXIM) • Identify items which are high cost in order to meet the requirements • Tradeoffs performed or “dead ends” encountered • Issues and items for future study • Delivery CD-ROM will include all analyses done by the IMDC this week • This presentation summarizes our work MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  4. MAXIM Information • Following information in the LAI-MAXIM-PF Prework folder • Prework, dated 10 April 2002 (Prework Report.htm) • IMDC kickoff presentation on May 13, 2002 by Keith Gendreau (going-in-13may02.ppt) • Information presented by Keith Gendreau to the IMDC and ISAL team in February 2002 (PeriscopeDesignMAXIM.ppt) • Other background information files • Material from recent ISAL studies are also available • Files are on idcsvr3 in a folder called missions. The ISAL studies that apply to LAI-MAXIM-PF are LAI Beam Combo (M) and LAI Super Star Tracker. I have mapped a network drive on my computer, calling it drive N:, making it quick and easy to refer to these files • Our August 1999 MAXIM study is in the misdir folder • This is a moderately future, (15 yrs to launch) study of concepts and approaches; design details are important, but will probably be changed before construction actually begins MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  5. Other Requested Trades or Studies • TDRSS Support vs. direct to ground (for early orbit?) • TDRSS often used for early orbit support of Launch and Early Orbit • Use of a TDRSS-like relay from L2 vs. use of DSN • TDRSS-like relay must be considered as a synergistic requirement by several L2 missions • TDRSS development for use at L2 far exceeds DSN cost for MAXIM MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  6. Requested “Standard” Products • Spreadsheets, bullet charts, or other briefly stated information useful to support ongoing analysis of this potential mission • Information in the “final presentation” is a summary of work done by the discipline engineers • System mass, power and cost spreadsheets, using “real” data where available and typical data for elements lacking specific information • Actual values for mass, power and cost are used where known • Educated estimates used where specific data does not extist • Cost estimated using both grass-roots and parametric estimating methods • Files of supporting analysis (e.g., Excel spreadsheets) • Included on final CD-ROM • Power System Sizing • Included in Power presentation • Mechanical sketches of the detector, hub and free-fliers in the launch shroud, in-transit to L2,deployed for Phases 1 and 2 • Included in the Mechanical presentation • Additional graphic files included on the CD-ROM MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  7. Analyses Show MAXIM to be an Advanced, but Feasible Concept • 1:00-1:05 Opening - John Martin • 1:05-1:25 System – Gabe Karpati • 1:25-1:35 Flight Dynamics – Steve Cooley • 1:35-1:45 Mechanical – Dave Peters • 1:45-1:55 Thermal – Wes Ousley • 1:55-2:00 Launch Vehicle – Larry Phillips • 2:00-2:10 Attitude Control – Eric Stoneking • 2:10-2:20 Propulsion – Bob Estes • 2:20-2:30 Power – Bob Beaman • 2:30-2:40 Flight Software – Kequan Luu • 2:40-2:50 Data Systems – Ron Vento • 2:50-3:00 Mission Operations – Tim Rykowski • 3:00-3:10 Mission Success – Dick Bolt • 3:10-3:20 Parametric Cost Analysis – Bill Lawson • 3:20-3:30 Wrap-up - John Martin MAXIM-PF, May 13-17, 2002Goddard Space Flight Center