1 / 8

Investigation and modeling of the Avondale Bridge in Christchurch, New Zealand

Investigation and modeling of the Avondale Bridge in Christchurch, New Zealand. Erickson Nguon University of Auckland, New Zealand June 10, 2013. Project Overview.

barton
Download Presentation

Investigation and modeling of the Avondale Bridge in Christchurch, New Zealand

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Investigation and modeling of the Avondale Bridge in Christchurch, New Zealand Erickson Nguon University of Auckland, New Zealand June 10, 2013

  2. Project Overview • The objective of this project is to investigate and model bridges, specifically the Avondale Bridge in Christchurch. The bridge suffered severe structural damage following the 2011 Christchurch Earthquake. • To create computer generated models of the bridges in SAP2000 with loadings that reflect the Christchurch Earthquake and with this model we can validate it by comparing the data from the model and the actual earthquake.

  3. Recent Progress • Began modelling the south abutment and pile of the Avondale Bridge in SAP2000 • Defined the nodes of the abutment and pile model, degrees of freedom, cross-sections of abutment and pile, and attached spring links resembling the soil Figure 1:SAP2000 model of the abutment and pile with springs connecting both the abutment and pile.

  4. Projected Progress • Meet with Liam to review my recent progress of the model bridge • Progress on modelling the north abutment of the bridge

  5. Howick Golf Course

  6. Christchurch Dmytro, Marta, Tony, and I flew down to Christchurch to extract stone and mortar samples from various structures. We extracted samples from a chapel, church/graveyard, St. Lukes, Arts Centre of Christchurch, and Fort Jervois. Captain Adams The Team: Tony, engineer from URS, Marta, Dmytro, and Erickson Trunk load of stone, concrete, and mortar samples A cathedral post earthquake

  7. Arriving at Fort Jervois to extract stone and mortar samples Leaving Lyttleton Port Fort Jervois Dmytro extracting mortar samples from Fort Jervois

  8. House near Avondale Bridge that sunk into the soil due to liquefaction. The gutter on the roof was only about 7 feet. Avondale Bridge north abutment; the south abutment is under construction

More Related