Financing Energy and Environmental Improvements: Edinburgh’s Experiences

Financing Energy and Environmental Improvements: Edinburgh’s Experiences. David Somervell, Energy & Sustainability Manager University of Edinburgh – Estates & Buildings Department 13 Infirmary Street, Edinburgh EH1 1LT Tel 0131 650 2073 http://www.eso.ed.ac.uk David.Somervell@ed.ac.uk.

Download Presentation

Financing Energy and Environmental Improvements: Edinburgh’s Experiences

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Financing Energy andEnvironmental Improvements:Edinburgh’s Experiences David Somervell, Energy & Sustainability Manager University of Edinburgh – Estates & Buildings Department13 Infirmary Street, Edinburgh EH1 1LT Tel 0131 650 2073 http://www.eso.ed.ac.ukDavid.Somervell@ed.ac.uk

  2. The imperative for action • Climate Chaos … is it for real? • How will it affect our organisations? • Developing a Strategic Approach • Invest now in Utilities Infrastructure • Decentralised Energy Solutions • Fundraising Experiences

  3. Extreme droughts will plague sub-Saharan Africa. Children stand behind one of thousands of livestock that died from thirst in southern Ethiopia. [REUTERS March 2006]

  4. What’s needed? • Interested, Enthusiastic People • Senior Management Support • Allocation of Resources (Money) PLUS … Some Measure of Luck / Timing!

  5. Start at the Beginning • An Energy / Carbon Management Policy • Commit to invest “X%” of Utility Spend • Allocate Management Responsibility • Establish Peer Support Network – EAUC • Holistic / Whole Institution Approach • Whole Life Cost / Best Value

  6. Edinburgh:“University in the City”… invested £12million in Decentralised Energy / CHP 2002-2005  2005: 1.6MWe CHP engine for George Sq  2003: 526kWe CHP engine for Pollock Halls 2004: 2.7MWe CHP engine for King’s Bldgs 

  7. Combined Heat and Power

  8. UK Energy Flows – 50% wasted

  9. George Square Energy Centre

  10. George Sq buildings now linked:

  11. George Sq: Trigeneration

  12. First remove old steam boilers…

  13. 1.6MWe Alternator bolts on

  14. High Efficiency, Low NOx Boiler

  15. 75 cubic metre Thermal Store

  16. 12 cylinder Jenbacher Engine • GE Jenbacher 612 Engine

  17. 600kWAbsorption Chiller

  18. Thanks to our CHP Partners • PB Energy Services – for Scheme Design • Crown House Technologies – Main Contractor • Estates & Buildings – implementation • Clarke Energy – Jenbacher Maintenance • Energy Saving Trust – for £5m funding support www.eso.ed.ac.uk

  19. Rankine Engineering Building

  20. Building Integrated PhotoVoltaics

  21. Why we have done this …? • Invest in infrastructure • Annual Carbon savings • Leadership role • Save money long-term

  22. Lessons Learnt Along the Way • Opportunism Pays – but need to be prepared • Read the Runes / keep an ear to the ground: • Defra / EST Community Energy programme • EST Local Energy Efficiency Advice Centres • DTI – Solar Major Demonstration Programme • EST Transport Energy Consultancy Support • Carbon Trust SSA / SSM / CHP / DA • SALIX Finance for Public Sector Organisations • Scottish Biomass Support Scheme • SUSTRANS Local Cycling Infrastructure Funds • Regional Development Agencies

  23. Edinburgh: Founded in 1582 Now 425 years old … and in 400 years time?

  24. …because there is only 1 planet