Forecasting Performance Measures

Forecasting Performance Measures. Comparing Forecasting Techniques. There is more than one approach that can be used to generate a forecast from a set of time series values. For the stationary Yoho model we used: Last Period 4-Period Moving Average

Download Presentation

Forecasting Performance Measures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Forecasting Performance Measures

  2. Comparing Forecasting Techniques • There is more than one approach that can be used to generate a forecast from a set of time series values. • For the stationary Yoho model we used: • Last Period • 4-Period Moving Average • 4-Period Weighted (.4, .3, .2, .1) Moving Average • Question: “Which method appears to be the most effective for a particular set of time series values” Answer – The one that comes “the closest” on the average if used to forecast values of the current time series.

  3. Forecast Errors What was forecasted to happen at time t using the forecast technique Forecast Error At time t What actually happened at time t To try to determine which one of these forecasting methods gives the “best” forecast, we evaluate the “success” of each method using a performance measure. Each performance measure begins by evaluating the forecast errors tfor each time period t given by: t = yt - Ft

  4. Performance Measures S |Dt| n yt n S(D t)2 n MAPE = MSE = |D t| n S MAD = |D t| LAD = max Mean Absolute Percent Error MAPE Mean Square Error MSE Mean Absolute Deviation MAD Largest Absolute Deviation LAD

  5. Which Performance Measure Should Be Used? • Choice of the modeler • Advantages • MSE gives greater weight to larger deviations (which could result from outliers) • MAD gives less weight to larger deviations • MAPE gives less overall weight to a large deviation if the time series value is large • LAD tells us if all deviations fall below some threshold value • Although we illustrate all 4 techniques, in general focus will be on MSE and MAD.

  6. Excel – Performance Measures for Last Period Technique =ABS(D3)/B3 =ABS(D3) =B3-C3 =D3^2 Drag cells D3:G3 down to D53:G53 =AVERAGE(E3:E53) =AVERAGE(F3:F53) =AVERAGE(G3:G53) Note: Rows 8-43 are hidden =MAX(F3:F53)

  7. Excel – Performance Measures for 4-Period Moving Average Technique =ABS(D6)/B6 =ABS(D6) =B6-C6 =D6^2 Drag cells D6:G6 down to D53:G53 =AVERAGE(E6:E53) =AVERAGE(F6:F53) =AVERAGE(G6:G53) Note: Rows 8-43 are hidden =MAX(F6:F53)

  8. Performance Measures for 4-Period Weighted Moving Average Technique =ABS(D6)/B6 =ABS(D6) =B6-C6 =D6^2 Drag cells D6:G6 down to D53:G53 =AVERAGE(E6:E53) =AVERAGE(F6:F53) =AVERAGE(G6:G53) Note: Rows 8-43 are hidden =MAX(F6:F53)

  9. Performance MeasuresSummary MSE MAD MAPE LAD Last Period 19631 110.96 32.90 359.00 4-Period MA 11037 88.75 25.61 223.25 4-Period WMA 11992 92.39 26.78 258.40 4-Period Moving Average performed best using all performance measures. This is not all ways the case.

  10. Review • Performance Measures allow the comparison of the accuracy of various forecasting techniques applied to a particular time series. • Performance Measures are all based on deviations of forecasted values from actual values in the time series: Δt = yt- Ft • MSE averages the squared deviations • MAD averages the absolute deviations • MAPE averages the absolute percent errors • LAD is the largest absolute deviation • Excel