Monitor for SVD1.6 and 2.0. T. Tsuboyama (KEK). SVD1.6 monitors. RTDs Almost every 5 cm in the aluminum part. 6 RTDs for the beryllium part in order to confirm the validity of the FEM simulation. Radiation monitors Hybrids on SVD are same as before.
E N D
Monitor for SVD1.6 and 2.0 T. Tsuboyama (KEK)
SVD1.6 monitors • RTDs • Almost every 5 cm in the aluminum part. • 6 RTDs for the beryllium part in order to confirm the validity of the FEM simulation. • Radiation monitors • Hybrids on SVD are same as before. • Hybrids on the IP chambers were made again • RADFETs were not installed. • PIN analog output will be send to the KEKB transient recorder. • A humidity sensor (Same as before) • Strain gauges are installed • In order to estimate stresses to the chamber. • Interpretation is not trivial
Accidents • Two RADFETs used for the nominal dose value are not stable now. • Several RTDs and one strain gauge have been broken while the accelerator beam chamber was connected to the Belle IP chamber. • Wires of several RTDs was broken while RTDs were put to the IP chamber. Improvement is necessary for SVD2 monitors.
SVD1.6 cooling • The helium circulation system was tuned up. • A high-temperature bearing is introduced. • The pulleys are aligned very carefully. • The beam is aborted about 20 msec after a problem is identified by the sequencer. In SVD1.4, a 30 seconds delay was inserted in order to reduce false beam aborts. • Oxygen is purged from the circulated water by bubbling of nitrogen gas in the water tank. This will reduce the possible aluminum corrosion rate. (No indication so far)
SVD2 monitors • Installation will start after the tungsten masks are fixed to the chamber. • All sensors and radiation hybrids are ready. • One monitor cable came off from its ZIF (zero insertion force) connector while SVD2 is taken out from the assembly stage. We should fix the cable well. • Improvement in the RTD connection is necessary. • Assembly of connection box has finished in Ljubljana (taken care by D. Zontar). • RADFET calibration at >Mrad is in progress (lead by S. Stanic.) • W. Trischuk has an idea of installing diamond detectors for instantaneous radiation measurement. (experimental?)
SVD2 IP chamber cooling • The pressure drop was measured for the real SVD2 chamber and the real paraffin circulation system. • The pressure drop versus paraffin flow rate is found to be same as that of the mock up. • The pressure drop in the tube was also measured. • Comparison with the design value is in progress. • News: A spare of the SVD2 IP chamber has been ordered to IHI. • DOCK/end ring cooling will be not so difficult from the SVD1 cooling.
Summary • Installation of SVD1.6 monitors are done successfully. • Several sensors were dead while/after installation. • Improvement will be done for SVD2 monitors. • SVD1.6 IP chamber cooling system is also improved by minor changes. • SVD2 monitors will be installed soon (next week?) • No major problem is found yet in the SVD2 cooling.