60 likes | 241 Views
Problems on the Playground. What problems do you have with the OES playground?. Students brainstorm problems Possible examples: field gets muddy, balls go into other areas . . Possible Solutions . Problem. Solution. 1. Separate play areas with fencing. 2. 3.
E N D
What problems do you have with the OES playground? • Students brainstorm problems Possible examples: • field gets muddy, • balls go into other areas • . • .
Possible Solutions Problem Solution 1. Separate play areas with fencing. 2. 3. • 1. Ball goes into other areas • 2. • 3.
Area or Perimeter? • Will you need to know the area of each section of the playground and/or the perimeter of each section?
Team Assignments • Surveyor—measure the dimensions of the different OES play areas. • Landscaper—research possible materials to be used • Architect—design the layout of the new playground • Project coordinator/presenter
Problems on the Playground Your group will design a new playground for OES. • You must use the existing play space. • All existing equipment must remain. • Your design should solve at least one of the stated problems. Team Assignments Each member of your team should have one job: • Surveyor—measure the dimensions of the different OES play areas. • Landscaper—research possible materials to be used • Architect—design the layout of the new playground • Project coordinator/presenter—explains the project how the new design solves a playground problem. Your presentation should include • a scaled playground map with measurements in yards and feet (1 cm = 1 foot) • amount of material needed to complete the project • name the problem and solution