20 likes | 144 Views
16:00 Meeting. Action Items. Transportation of EM2 TEM/PSU to bld 33 – Eliazar Ortiz Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Rich Gobin, Tom Borden, Jerry Clinton Proof test of Mini-Tower assembly lift fixture – Dave Kiehl
E N D
Action Items • Transportation of EM2 TEM/PSU to bld 33 – Eliazar Ortiz • Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Rich Gobin, Tom Borden, Jerry Clinton • Proof test of Mini-Tower assembly lift fixture – Dave Kiehl • Manufacture Van de Graaff part – Reggie Rogers • Repair Van de Graaff – Gary Godfrey • Prepare for Van de Graaff operations – Gary Godfrey, Mech. Team • Build Mini-Tower assembly cart/cage – Mech. Team • Setup operator workstations in room 102 – John Canfield • Operator training (Gary, Tune, Larry, Brian, John) for data taking – Online, Offline • Check Cosmic Ray test data – Xin Chen • Module time-in procedure – Brian Horwitz, Larry Wai • Determine schedule for delivery of EM2 EGSE to IFCT – Brian Horwitz • Setup for EM2 TEM/PSU bench tests – Eliazar Ortiz • EM2 TEM/PSU Safe-to-mate Test – Brian Horwitz • Swap-in EM2 TEM/PSU – Eliazar Ortiz • Setup for Single Bay LPT – Eliazar Ortiz • Execute Single Bay LPT (w/ EM2 TEM/PSU) – Brian Horwitz, John Canfield, Jim Panetta, Lester Miller • CAL pedestal and noise calibration (compare w/ EM1) – Brian Horwitz • Execute CAL CPT – Brian Horwitz, John Canfield • Execute TKR CPT – Brian Horwitz, John Canfield