60 likes | 217 Views
LINAC4 transfer line – optics. L4. L2. PSB. Optics Layout Tunability Safety margins. ↕ 2.5m. LINAC4 transfer lines : 177.31 m (from PIMS out to foil); 69.83 m new line,then join at BHZ20 the present Linac2 line (107.48 meters from BHZ20 to foil).
E N D
LINAC4 transfer line – optics L4 L2 PSB • Optics • Layout • Tunability • Safety margins ↕ 2.5m LINAC4 transfer lines : 177.31 m (from PIMS out to foil); 69.83 m new line,then join at BHZ20 the present Linac2 line (107.48 meters from BHZ20 to foil). Active elements : 4+2bendings;16+18 quads,11+11 steerers and 1 RF cavity. M. Eshraqi, L. Hein, A. Lombardi (BE-ABP)
Optics-layout. • Uncompensated longitudinal space charge forces, • Dispersion and space charge • X-Y coupling • Bottlenecks : RF cavity; septum , distributor • Match the six conditions at the PB (disp=0;dis-1.4;various beta) • Contain the emittance increase (30% at max, can be reduced) • Accept energy swing of 1.2 MeV • At foil: 65mA in 0.3-0.4 pi(rms mm mrad norm) ΔE= 100-150 keV rms W A L L
Optics and tunability X,y rms Ratio aperture/rms above 6 everywhere
Errors and Correctors • Static alignment errors can be corrected with steerers • Jitter in the bending power supplies should be kept below 10-4 • Jitter in linac energy is important for DIS and SEP acceptance
AT DIS, beam size-all cases. • In 4 rms there is more than 90% of the beam • Effect of energy painting is of the order of 5-10 mm (not included in the plot). D=1.4 D=0 vertical aperture might be the limit for tunability in the case D=0 , unless we change yc=5.19 mm