Cogeneration Public Hearings

Cogeneration Public Hearings. An embedded cogenerators response Andrew Carr +27 82 339 3887. Embedded Cogenerators. Large industrial players smelters, pulp and paper mills, refineries, steel producers, chemical plants, large mining houses, etc. Smaller industrial players:

Download Presentation

Cogeneration Public Hearings

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cogeneration Public Hearings An embedded cogenerators response Andrew Carr +27 82 339 3887

  2. Embedded Cogenerators • Large industrial players • smelters, pulp and paper mills, refineries, steel producers, chemical plants, large mining houses, etc. • Smaller industrial players: • Niche plastic and chemical producers, hospitals, prisons, manufacturing processes, agro-processing, confectionary producers, independent miners, etc.

  3. Advantages of Cogeneration • High energy efficiency • No/little need for new transmission infrastructure • Quick implementation for many projects • High capacity factors • Typically electricity is produced where it is consumed • Competitive space developed by private sector

  4. Industrial Cogenerators Net Importer Net Exporter

  5. Industrial Cogenerators Net Importer Net Exporter

  6. Creating an Enabling Environment • The Industrial Sector needs support to develop cogeneration projects; two important typical incentives; • Power Purchase Agreements (PPAs) through Procurement Programme • Capital Incentives for Cogeneration/ Energy Efficiency Projects • These two enablers each enhance the viability of cogeneration projects

  7. Typical Cogeneration Incentives

  8. Match Cogenerator with Incentive

  9. Capital Incentives needed for the embedded cogenerators! • The entity typically sees electricity as non-core, and a business threat • A capital incentive programmewill accelerate efficient cogeneration from private sector • No power purchase agreement (PPA) involved, as power is used on-site • No impact on the grid • These projects represent Demand Side Management (DSM) or Integrated Demand Management (IDM) projects, and alleviate the already overburdened grid

  10. Capital Incentives for the embedded co-generators • ESKOM have an existing Integrated Demand Management (IDM) Programme • Has enabled a few Cogenerator Projects • Reported that these ESKOM IDM initiatives have been suspended by ESKOM and/or NERSA due to funding constraints. • Severe blow to the embedded cogenerator potential • Accelerate the Reinstatement of the Capital Incentive Scheme to realise Cogeneration in this sector

  11. Benefits of a typical Embedded Cogenerator Project An ESKOM IDM Sponsored Project

  12. Results of an Embedded Cogenerator • Up to 6.4MWe will be generated equating to approximately 47 803MWh per year or 3 983MWh per month of cogeneration • Indication of the electricity produced due to “cogeneration” over a typical 24 hour are shown below. Kilowatts electrical 24 Hours

  13. Some Key Benefits From This Project • This project has contributed and contributed favourably to the Sustainable Development of its region • Increased job opportunities in an Industrial center • Transfer of specialist technology and economic growth into the Industrial center. • Combating of climate change by reductions in carbon emissions and water consumption. • Alleviated Transmission and Distribution Constraints