An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Terrestrial Ecology section of the EIA for the proposed desalination plant at Mile 6 Presented by: Dr. JulianeZeidler Reagan Chunga Integrated Environmental Consultants Namibia (IECN) 04 February 2009

  2. Background • Coast: unique biodiversity, of global significance • Many endemic animals, breeding bird colonies, specialised fog-dependent lichens & vegetation, succulent flora, reptiles etc. • Around 1,6 million birds belonging to 73 species regularly occur along the coastline; up to 770 birds per km of beach • SEA calls for no developments; cumulative effects to be considered • The construction and operation of desalination plant and supporting infrastructure will negatively affect on the terrestrial ecology

  3. Envisaged main Terrestrial Ecological issues • Key issue 1: Site selection and extent of operation; industrial processes • Key issue 2: Biodiversity conservation, esp. endemics • Key issue 3: Sustainability of ecosystem services

  4. Methodology • Site visit and field assessment of proposed sites/area for all infrastructure to be developed • Focal walks • Transects (as appropriate/necessary) • Mapping – if required • Review of relevant documentation • Focal interviews (Rod Braby, Dr. JohHenschel) • Prepare draft report • Revisions based on reviews • Potentially follow-up site visits

  5. Further information required • Full extend and location of infrastructure • Final operations (e.g. braine disposal) – potential compounded and associated impacts Overall issue: • Cumulative effects should be considered for all developments (SEA)