90 likes | 184 Views
Objective SRC-RLMK. ESSIP Plan 2014. Agnieszka DYBOWSKA DPS/PEPR 19.09.2014. Comprehensive Explanation. Scope/Applicability: Applicable to civil & military REG, incl. NSAs → only REG/ MIL SLoAs Encompasses ANS plus the related ATFM and ASM functions (full ATM/ANS)
E N D
Objective SRC-RLMK ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR 19.09.2014
Comprehensive Explanation Scope/Applicability: • Applicable to civil & military REG, incl. NSAs → only REG/ MIL SLoAs • Encompasses ANS plus the related ATFM and ASM functions (full ATM/ANS) • Applicable Areas: 4 States: AM, AZ, TR, UA ESSIP Plan 2014 / Objective SRC-RLMK
Comprehensive Explanation REG01: Assess existing applicable regulations against ESARRs & address the differences identified – see list of reference regulations & supporting material in ESSIP Plan – Edition 2013; For ALL EU States (EC regulations apply directly): • ESARR1 and 6 are fully transposed through (EU) 1034/2011 and (EC) 482/2008 respectively; But States may also have national IRs in place (references needed); • National regulations transposing Directives 2003/42/EC and 94/56/EC are sufficient to address the ESARR 2 areas covered in the 2 Directives; • (EU) 1033/2011 satisfactorily covers ESARRs 3 & 4 as regards providers of ATS/CNS primarily to GAT; ASM & ATFM, as well as the missing Risk Classification Scheme must be addressed through national regulations (CP to ask); • National regulations transposing Directive 2006/23/EC are sufficient to address ESARR 5 areas covered in that Directive; Those areas of Sections 5.1 and 5.2 not covered in the Directive should also be addressed through national regulations; • (EU) 1033/2011 satisfactorily covers a basic legislation for engineers & technical personnel undertaking operational safety related tasks; further national rules are necessary to cover at least Article 8 of (EC) 2096/2005 (Saf Reg of Eng & Tech Personnel) and Section 5.3.1 of ESARR5. For ALL non-EU States (CH, NO, ECAA etc): • FP to provide list of relevant national regulations and their references ESSIP Plan 2014 / Objective SRC-RLMK 3
Comprehensive Explanation REG02: Develop/publish regulation compliant with the amended ESARR1 (For ALL non-EU States LAs must give info on the relevant national law & regulation(s) transposing ESARR1, their references & language in which they are available) REG03: Develop/publish regulation compliant with the amended ESARR2 (For all States, LAs to address references of new or modified regulations) REG04: Develop/publish regulation compliant with ESARR3 (LAs to address evidences ref. application to ASM, ATFM) REG05: Develop/publish regulation compliant with ESARR4 (LAs to address evidences ref. application to ASM, ATFM and ref. Risk Classification Scheme applied) REG06: Develop/publish regulation compliant with ESARR5 for ATCOs REG07: Develop/publish regulation compliant with ESARR5 for engineering & tech personnel undertaking ops safety-related tasks REG08: Develop/publish regulation compliant with ESARR6; REG09: Notify ICAO of any differences between applicable safety regulations & ICAO SARPs; LAs to address mapping between ICAO SARPs and applicable regulations transposing the ESARRs; and of formal notifications to ICAO ESSIP Plan 2014 / Objective SRC-RLMK 4
What is new or has changed since LSSIP 2013 • No changes • No link with European ATM Master Plan ESSIP Plan 2014 / Objective SRC-RLMK 5
Supporting Material • All ESARRs and related Guidance Material • All applicable EC legislation transposing ESARRs in accordance with Article 4 of the Regulation No 550/2004 ESSIP Plan 2014 / Objective SRC-RLMK 6
ESSIP Report 2013 • Two out of fours States reported Objective SRC-RLMK as Completed. • The remaining two States reported delays in implementation caused mainly by partial implementation of ESARRs. • Since last year’s report there has been no progress in the implementation of this Objective. ESSIP Plan 2014 / Objective SRC-RLMK 7
Objective Coordinator’s Analysis, recommendations, tips & tricks • SRC-RLMK is about having the regulations & corresponding institutional arrangements in place, and NOT about if they are effectively implemented/ applied by the ATM/ANS providers; • CPs/FPs to be reminded that the completion of each SLoA is to be judged exclusively on the basis of promulgation of the relevant regulations and implementation of the necessary legal/institutional arrangements; • SRC-RLMK does not verify if the respective regulations are effectively implemented & applied at the level of the ANSPs (where applicable) or if there is corresponding oversight exercised by the NSA (that is done in the other 4 SRC objectives and in the SES Annual Report; • Request that REG/NSA specifies the legal references to the national implementing rules and other acts documenting their local arrangements which implement the ESARRs from the REG perspective. ESSIP Plan 2014 / Objective SRC-RLMK 8
Links and contacts • Objective Coordinator: Dybowska A., +32 2 729 5152agnieszka.dybowska@eurocontrol.int • DSS Objective Expert(s): Deboeck, M., +32 2 729 3812 Marc.DEBOECK@eurocontrol.int ESSIP Plan 2014 / Objective SRC-RLMK 9