30 likes | 112 Views
Flush out schedules for preparation and execution OL455 levels to MEF B aseline instrument configuration (depends on software status?) both specs 390 to 950, DBS at 605nm, simultaneous both specs 390 to 950, DBS at 605nm, sequential blue spec only, option 370 to 720
E N D
Flush out schedules for preparation and execution • OL455 levels to MEF • Baseline instrument configuration (depends on software status?) • both specs 390 to 950, DBS at 605nm, simultaneous • both specs 390 to 950, DBS at 605nm, sequential • blue spec only, option 370 to 720 • two sequential scans, would saturate blue half of CCD • decrease # of channels by 2, couple Red DBS output to BSG • foreoptic to track assignments • LED protocol • Iris adjustments to get all tracks on scale • tests at Snug on Ho’okele • when can we start taking data? • describe and implement characterization & calibration steps • BluLoop and Cool White stability • Specs themselves: responsivity, stability, track/imaging stability, FOV, integration time, linearity, along track, understand saturation, on-chip binning, camera sync error • coordinate team efforts