1 / 17

Sim Mass Activation Case Study

Sim Mass Activation Case Study. Gigaspace CloudCrowd Event. Mandhir Gidda Technical Director (UK). Agenda. Who are razorfish? Business Case Solution Outline Costs and ROI Security. Who are Razorfish?. Razorfish. 160+ staff UK. 45 000+ colleagues in the groupe.

becka
Download Presentation

Sim Mass Activation Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sim Mass Activation Case Study Gigaspace CloudCrowd Event Mandhir Gidda Technical Director (UK)

  2. Agenda • Who are razorfish? • Business Case • Solution Outline • Costs and ROI • Security

  3. Who are Razorfish?

  4. Razorfish 160+ staff UK 45 000+ colleagues in the groupe 2000+ staff worldwide ?

  5. What people say about us • Razorfish stands out in designing both transaction-led and image-led consumer-facing websites, based on exceptional user-centered design and strong creativity. Their user personas earn top scores.FORRESTER RESEARCHThe collaborative effort between Ford and Razorfish is a model of a full-service interactive consultancy… the agency is viewed within the Ford organization as a repository of ford.com standards and best practices.GARTNER RESEARCHRazorfish is serious about how users interact with solutions -- no one else comes close.MICROSOFT (Razorfish client)Razorfish has encouraged us to push the boundaries. Their strategic thinking always makes me think that no matter what the problem, we can find a solution.VISA (Razorfish client)

  6. Business Case

  7. Sim Mass Distribution Proposition • ZEPPELLIN Project: Inception Nov‘08 – Launch March 13th ‘09 • Self service postpay sim-only activation :- • Economic climate • Retail time to service • Handset Security/Fraud • Accurate consumer targeting • Measurements of campaign effectiveness • Extremely attractive ‘options’

  8. Business Context • Legacy Engineering Environment • Extended Procurement Cycle • Locked into hardware vendor costs (Sun, Oracle, BEA) • Changing nature of projects results in – Lack of/Contention for internal dev int, func test, perf, scratch env. Support is 9-5. • TTM/TTL extended • Extremely large operational landscape • Lack of response to competitive pressures

  9. Solution Outline

  10. Configuration • GigaSpaces 6.6.3 • GigaSpaces Cloud tools V 2.3.5 • Web application deployed in GigaSpaces service Grid enabling scaling on demand • GigaSpaces used for http session clustering (3 replicated space) • Designed to cater for approx. 3000 activations /hour • Each activation utilises approx 10 http screens • Deployment uses 2 HTTP Apache servers, 2 GigaSpaces Service Managers and 3 GigaSpace Containers

  11. Seperation of UI Processes from Business Proceses (ALICE) • Web Service calls use two-way SSL authentication & IP restriction • Dynamic Provisioning Agent (DPA) - SLA driven scaling/Self healing • Ganglia HPC Monitoring • Solution build using GS-CCF: httpd, DPA, Session Clustering • Easily switch from functional test and Production through Elastic IP’s

  12. We were finished by end Jan‘09 but Telco took until March to get IP’s opened up. This delayed launch but also missed ad spend opt out dates Hybrid Cloud Retain that which changes slowly, Cloud that which changes frequently(Content, Scaling)

  13. Costs and ROI

  14. Comparitive Platform Costs • Initial Cost, Large instances • Gigaspaces $0.20 - $0.80 • 2 Apache, 2 GSM, 3 GSC, 1 UI = 8. • Mix types = $5/hr • $43K per anum • (No Func/Perf env’s)

  15. Comparitive Platform Costs • Standard Platform, Upfront Cost, • 2x Dev Integration (T2000) = 7K • Functional Test = 2 Apache, 2 AppServer (T5220 x 34K) = 70K • Perf Test = 2 Apache, 2 AppServer (T5220 x 34K) = 70K • Production = 2 Apache, 2 GSM, 3 GSC, 1 UI = 180K • Total = Approx 320K (no burst scaling) • (Ops team cost 200K/month)

  16. Security • Multiple EC2 security groups used to lock down the ports • Only port 80 and 443 open on Apache machines to all • A special security group to allow in group communication • Special security groups for port 22 and GigaSpaces administration console access(admin). All restricted by IP address or range. • Everything password protected

  17. mandhir.gidda@razorfish.com

More Related