Forecasts for renewable energy and disaster management

Forecasts for renewable energy and disaster management. Renate Hagedorn Scientific and Operational Management Division Deutscher Wetterdienst. ?. ?. ?. 2012: 25%. 2010: 18%. Motivation. Moving towards sustainable supply of energy based on renewables

becky
Download Presentation

Forecasts for renewable energy and disaster management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Forecasts for renewable energy and disaster management Renate Hagedorn Scientific and Operational Management Division Deutscher Wetterdienst

  2. ? ? ? 2012: 25% 2010: 18% Motivation • Moving towards sustainable supply of energy based on renewables • Focus on wind- and solar power production • Weather dependent, fluctuating power production Contribution of Renewables [%] to Total Power Production in Germany

  3. predictable controllable A new component in the system Load + Net Transfer = RE + CE 65% 35% Conventional Energy Renewable Energy Net Transfer Energy Consumption 90%

  4. German High-Voltage Transmission System Challenge for TSOs • Ensure the balance between production and consumption at any time… • …under the constraint of limited grid capacity Growing proportion of weather-dependent power production requires new strategies for managing the power grid

  5. Role of Transmission System Operators (TSOs) • Various options to guarantee stability of grid: • Re-dispatch of conventional power plants, transmission of surplus energy between regulatory areas, positive/negative energy reserves (pumping stations) • Down-regulation of renewable power plants • Unexpected events can jeopardise safety of grid: • Unexpected high production of power can cause failure of equipment (power transformation stations) with possible consequences also for neighbouring grids • Unexpected low production of power can cause shortages (load shedding)

  6. HIW for PV power production Fog predicted, but not observed „observed“ Difference: Day-Ahead Forecast ~ 6 GW, Intra-Day Forecast ~ 3 GW Operating Reserve: ±4.5 GW

  7. HIW for wind power production Observed wind below the level necessary for peak production Prediction „Observation“ 30.01.2013 30.01.2013 source: http://www.transparency.eex.com (average electricity consumption: ~60 GW)

  8. 〈UF(x)〉 = UF (〈x〉) 〈x〉 ● ● ● ● ● ● ● ● ● Expected Value of user function 〈UF〉 (Theoretical) linear user function

  9. UF (〈x〉) ≠ 〈UF(x)〉 〈x〉 ● ● ● ● ● ● ● ● ● Expected Value of user function 〈UF〉 Nonlinear user function The expected value of the user function is not equal to the user function of the expected value, but depends on the whole ensemble

  10. So far the theory… • “In theory” the advantages of incorporating information on the level of uncertainty are acknowledged • R&D of TSOs actively ask for scenarios • Operation Managers are (partly) still reluctant to incorporate this information • Main concerns: • Accountability… “if something goes wrong we need to justify our decision” • Information overload… “too much information is confusing rather than helping” • The way forward: • Automatic (user-specific) systems to suggest “best decision” • Condensed (user-specific) presentation of information to prepare for alternative scenarios • Projects to explore this route just starting at DWD

  11. New research projects • Funding agency: Federal Ministry for Environment • Collaborative projects with partners in research and industry • EWeLiNE • Duration: 4 years, 12/2012 – 11/2016, 13 scientist positions • Highlight: assimilation of wind power production observations • ORKA • Duration: 3 years, 08/2012 – 08/2015, 2 scientist positions • Highlight: direct communication between developer and user on deficiencies in prediction system, i.e. frequent cycle of development-evaluation work • External advisory committee: industrial user and provider of weather- and power-prediction models, to: • discuss results • incorporate external experiences • insure that developments are geared towards the needs of general user

  12. Disaster Management

  13. Disaster Management

  14. a broken link… Disaster Management • What is GDACS? • GDACS is a cooperation framework under the United Nations umbrella. It includes disaster managers and disaster information systems worldwide and aims at filling the information and coordination gap in the first phase after major disasters. • GDACS provides real-time access to web-based disaster information systems and related coordination tools. • What services does GDACS provide? • provides alerts and impact estimations after major disasters • develops standards and guidelines for international information exchange in disasters • provides the real-time coordination platform • coordinates the creation and dissemination of disaster maps and satellite images • Detailed weather forecast are provided rapidly on demand by SARWeather

  15. ECMWF EPS-FC Noumea, New Caledonia 120 mm 08/03/2013, 12 UTC 110 mm 09/03/2013, 12 UTC 40 mm 10/03/2013, 12 UTC 50 mm 11/03/2013, 00 UTC Two levels of response • An event (disaster) is detected: • Assessment of humanitarian impact • Actual response • An event (potential disaster) is predicted: • Depending on the level of (un)certainty preparations for actual response • Continuous update on prediction

  16. Summary • Growing proportion of energy supply based on renewables requires • new strategies to integrate meteorological information into decision-making • focus on reliable forecast systems • consideration of user defined high-impact events • National disaster relief organizations ask for • global early warnings for preparatory actions • frequent updates in the event of a possible disaster • consideration of individual vulnerability levels