C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall

Governing Board Meeting December 12, 2013. C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall. John Mitnik, P.E. Engineering & Construction Bureau Chief. C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall. Bid Summary.

bela
Download Presentation

C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Governing Board Meeting December 12, 2013 C-4 Canal Bank ImprovementsBelen Phase 2Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief

  2. C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall

  3. Bid Summary • RFB Advertised: October 15, 2013 • Bid Opening: November 15, 2013 • Number of Bids received: 8 • Bid Range: $1,120,000 – 2,223,000 • Engineer’s Estimate: $1,429,549 to $1,580,028

  4. Resolution • A Resolution of the Governing Board of the South Florida Water Management District to authorize entering into a 358 day contract with Arbor Tree & Land, Inc., the lowest responsive and responsible bidder, for C-4 Canal Bank Improvements Belen Phase 2, Flood Protection Berm & Wall Project, in an amount of $1,360,250.00, for which $1,110,892.00 in ad valorem funds are budgeted in FY14 Engineering & Construction Bureau's capital improvement program and the remainder is subject to the Governing Board approval of the FY15 budget; providing an effective date.