Performance Tested Comfort System Program Update January 24, 2007. PTCS Status. Measures Installed Training Quality Assurance Visits Ecos Consulting Perspective Utility Perspective. PTCS Measures Installed - Public Utilities. 18 Public utilities have reported over 500 measures

bela
Download Presentation

Performance Tested Comfort System Program Update January 24, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Performance Tested Comfort System Program Update January 24, 2007

  2. PTCS Status • Measures Installed • Training • Quality Assurance Visits • Ecos Consulting Perspective • Utility Perspective

  3. PTCS Measures Installed - Public Utilities • 18 Public utilities have reported over 500 measures • FY06*: 182 duct sealing, 115 heat pump • FY07: 199 duct sealing, 43 heat pump *BPA’s fiscal year is Oct 1-Sep 30 • State distribution of Public Utilities • Oregon: 365 duct sealing; 125 heat pumps (10% qualify for tax credit) • Washington: 15 duct sealing; 14 heat pumps • Idaho, Kootenai: 1 duct sealing; 10 heat pumps • Conservative savings estimate • Duct Sealing + Heat Pump commissioning = 0.2 aMW, to date

  4. Other Regional Programs • Idaho Power duct sealing program: over 430 mobile homes • CheckMe: over 130 heat pumps • EWEB • Emerald PUD • Other?

  5. Training Sessions • Completed • 6 duct sealing • 8 heat pump commissioning • Requests pending • 7 duct sealing • 9 heat pump commissioning • January 2007, added $17,600 to training budget Contact Jennifer Williamson (503) 525-2700 ext 103 or jwilliamson@ecosconsulting.com Martin Wilson (503) 525-2700 ext 140 or mwilson@ecosconsulting.com

  6. Future Training • To be scheduled • Skamania & Cascade Locks • Idaho Falls (area) • Ravalli & Mission Valley • Canby & Monmouth • Central Lincoln & Drain • Work with Northwest Energy Efficiency Alliance to share training • Ellensburg • Port Angeles (duct sealing) • Idaho Falls

  7. Training Costs • Cost Sharing Options (after the first training session) • Flat reimbursement for verified attendance • Training costs shared equally by BPA and participating utilities • Utilities are welcome to contact Ecos Consulting directly to arrange self-funded training • Certified Technicians are welcome to contact the Alliance regarding other training opportunities and costs

  8. Quality Assurance Visits • Ecos Consulting is preparing a quality assurance (QA) implementation plan • As many as 50 QA visits, based on measures claimed • High volume certified technicians with high savings potential • Central Electric • EWEB • Springfield

  9. Utility Perspectives • What is working • Opportunities for improvement • PTR system upgrades coming in February