An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BaBar and the Grid Roger Barlow Dave Bailey, Chris Brew, Giuliano Castelli, James Werner, Fergus Wilson and Will Roethel GridPP18 Glasgow March 20th 2007

  2. What we’re doing • Monte Carlo • Skimming • Data Analysis

  3. History 2002  Pioneering BaBarGrid demonstrator  BaBar analysis software set up at RAL ‘Tier A’ centre. Successful displacement of physics analysis off-site. Common fund rebate to PPARC 2007 • BaBarGrid still not in general use  PPARC renege on MoU disc/CPU allocation, RAL lose Tier A status. PPARC loses rebate

  4. BaBar Tier A news… • IN2P3: The commitments of CCIN2P3 for 2007 (150 TB and 1500 CPU units) and 2008 (200 TB and 1500 CPU units) are confirmed. For both years, the CPUs will be there at the end of June and all workers will be made available to users during the summer; the disks will be available from mid-July and will need a couple of months to be fully deployed. We foresee four shutdowns, about one day long each, per year; they will be announced well in advance. For 2007, the dates are March 20, June 12, September 18 and December 4. SL4: driven by LHC. • GridKa: the situation for GridKa hasn't change: 27 TB of disk and 100 SLAC units of CPU in 07 and 08. Hardware for 2007 is already in place, installed and currently running the burn-in tests. CPUs 2007 will be delivered on April 1st, disk 2007 has to be configured and should be made available during April as well. Concerning 2008, the current milestone is again April. SL4: new CPUs already running SL4; other CPUs will be upgraded from SL3 when gLite is shown to work properly with SL4. • RAL: no new investment at RAL Tier A for babar. Non-LHC nominally get 5-10% of the overall computing resources (dominated by the LHC MOU) but currently going through a budget crisis. SL4: will be driven by CERN and LHC; Tier 2s likely to follow RAL's lead. • INFN: Padova has bought its 07 hardware, some already delivered. CNAF disk installed; CNAF cpu will be installed after their shutdown which should be in May (subject to sign-off on safety aspects by fire department etc...). For 08, no formal decision. Funding will no longer be direct to CNAF but via experimental budgets. In this case, BaBar Italy can either pay from their budget to install hardware in Italy or pay the common fund to install at SLAC. SL4: Padova is a babar-only site so can change when we need; CNAF will follow LHC.

  5. Are we downhearted? No! Reasons to be cheerful 1) Tier 2 centre at Manchester with 2000 CPUs, 500 TB. With a fair share of this we can really do things 2) Release 22 of BaBar software is now out. Root based conditions database installed – last use of Objectivity finally removed.

  6. Monte Carlo (SP) • Tarball made of all programs and files • Runs at Manchester and RAL as production system • >500 Million events generated and processed and sent to SLAC • Will extend to more sites now Objectivity is not required

  7. Skimming BaBar Analysis model Skims 220 different Skims (and growing) For different analysis selections Some pointer skims Some deep copies AllEvents 66 TB

  8. Skimming details Major computing load – CPU and I/O Skimming 100K events takes ~10 hours and there are ~109 events in AllEvents BaBar looking for resources outside SLAC Skim process uses TaskManager software (written and gridified by Will Roethel) Test at RAL Tier 2 centre: production at Manchester Tier 2 (Chris Brew, Giuliano Castelli, Dave Bailey)

  9. Skimming details Set up 2TB xrootd server. Import data from SLAC (slow: ~10 MBit – but we’re working on it) Submit skim jobs to Tier 2 using Grid Moving data between server and farm is fast (~Gbit) Skim files (~1Gbyte/job) sent to RAL for merging. (Will do at Manchester in due course.) System running successfully. Going into production

  10. EasyGrid: the job submission system that works! James Cunha Werner GridPP18 Meeting – University of Glasgow

  11. Available since GridPP11 - September/2004: http://www.gridpp.ac.uk/gridpp11/babar_main.ppt • Several benchmarks with BaBar experiment data: Data Gridification: • Particle identification: http://www.hep.man.ac.uk/u/jamwer/index.html#06 • Neutral pion decays: http://www.hep.man.ac.uk/u/jamwer/index.html#07 • Search for anti deuteron: http://www.hep.man.ac.uk/u/jamwer/index.html#08 Functional gridification: • Evolutionary neutral pion discriminate function: http://www.hep.man.ac.uk/u/jamwer/index.html#13 • Documentation (main web page): http://www.hep.man.ac.uk/u/jamwer/ 109 html files and 327 complementary files • 60 CPUs production and 10 CPUs development farms running independently without any problem between November/2005 and September /2006.

  12. Over a year ago Date: Thu, 22 Dec 2005 15:51:08 +0000 From: Roger Barlow <roger.barlow@manchester.ac.uk>To: babar-users@lists.man.ac.ukSubject: [BABAR-USERS] Manchester babarDear Manchester BaBarians,2 bits of good news.1) easyroot works. I have carefully idiot-proofed it, and if I can make it work then anyone can. Today it gives access to a small farm, meaning you can run several jobs in parallel and speed up your tauuser analysis by an order ofmagnitude. Soon we will enable the rest of the existing BaBar farm. And beforelong we have the 1000 node Dell farm.For brief instructions see http://www.hep.man.ac.uk/u/roger/easyroot.htmlFor full instructions see http://www.hep.man.ac.uk/u/jamwer/rootsrc.html2) we have a new big disk, thanks to Sabah. 1.6 TB. We need to decide what toput on it (and what to call it.)Father Christmas has been busy...Roger

  13. η mesons in  decays Source Dr Marta Tavera

  14. Physics Analysis on the Tier 2 • Copied ntuples for a complete analysis to dCache • Run ROOT jobs using minimal afs/gsiklog/vanilla globus system • Struggling with dCache problems • Stress testing our dCache exposes weak points • dCache files distributed over ~1000 nodes. Inevitably, some nodes fail. dCache catalogue doesn’t know this. Jobs die • Progress is slow but positive. • Will run standard BaBar analysis (BetaApp) on data collections as next step

  15. Outlook • GridSP: In production. Will extend to more sites • GridSkimming: Ready to go • EasyGrid: Works. For users needs farms with BaBar data • BaBar Data at Manchester Tier 2 • dCache being tested • xrootd now possible • Plan to try slashgrid soon ntuples today, full data files tomorrow

  16. And finally See you in Manchester for OGF20/EGEE and EPS conference has ‘Detectors and Data Handling’ session Now open for registration and abstract submission