70 likes | 346 Views
Optimisation. Core Elements of PRIMO. Financials. Exploration data. Assumptions. Mine plan optimisation. Stope location optimisation. Access location optimisation. Access schedule optimisation. Production schedule optimisation. Strategy Selection. Rock Mechanics Constraints.
E N D
Core Elements of PRIMO Financials Exploration data Assumptions Mine plan optimisation Stope location optimisation Access location optimisation Access schedule optimisation Production schedule optimisation Strategy Selection Rock Mechanics Constraints
Geomechanics Constraints Stopes Drifts
Mine Data Financial Data Constraints Schedule Optimisation Tool database Generate Reports Export for Animation
Automation Optimisation Developed with Barrick as a Solution Partner and Industry Sponsor Note: Commercialisation being undertaken with Gijima AST (by January 2008) Analysis
PERM – What now ? Potential Sponsor Solution Partners • Rio Tinto – Automated Drift Development Layout for Block Caving • CVRD-INCO – Project Evaluation / Life of Mine Planning • Xstrata – Case Study Verification for Cut and Fill • Symboticware – Integrating Simulation with Production Optimisation