1 / 7

DOING IT RIGHT THE FIRST TIME BY ADOPTING QUALITY ASSURANCE SYSTEMS PROCESSES

DOING IT RIGHT THE FIRST TIME BY ADOPTING QUALITY ASSURANCE SYSTEMS PROCESSES. The School of Chemical Engineering. The University of Adelaide. Introduction. ISO Established May 2001 Integrated in workshop practices Outcomes for workshops Improve services

benjamin
Download Presentation

DOING IT RIGHT THE FIRST TIME BY ADOPTING QUALITY ASSURANCE SYSTEMS PROCESSES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DOING IT RIGHT THE FIRST TIME BY ADOPTING QUALITY ASSURANCESYSTEMS PROCESSES The School of Chemical Engineering The University of Adelaide

  2. Introduction • ISO Established May 2001 • Integrated in workshop practices Outcomes for workshops • Improve services • Enhance efficiency,quality and satisfaction • Guarantee OH&S compliance

  3. IDENTIFYINGMANAGEMENT SYSTEMS • Main Processes to be developed: • Plan before starting • Purchasing system • Formal data recording • Staff Training • Quality Improvement Suggestions • Workshop maintenance program

  4. MANAGEMENT FORMS & DATA • Project management flowchart • Data recording forms • Equipment Work Authorisation (EWA) • EWA hazard checklist • Equipment/Materials Purchasing • Using a preferred Supplier

  5. PROJECT MANAGEMENT FLOWCHART

  6. WHAT ARE THE BENEFITS • Some examples: • Control of Workshop management • OHS&W requirements compliance • Improved efficiency from: • Formal workshop processes • Better planning • Continual Improvement • Recording data/future reference

  7. Close • Quality assurance systems assist through: • Continual improvement to high quality services: • Repeatability of quality • More efficient • Continually reviewed • Relevant & practical management

More Related