80 likes | 224 Views
CASE STUDIES. STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS. KAR. AP. CUSTOMER: PTC. TRADER: PTC. INJECTING UTILITY JINDAL. WR GRID. MSEDCL. DRAWEE UTILITY MSEDCL. HVDC BACK TO BACK AT BHADRWATHI IN WR.
E N D
STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP CUSTOMER: PTC TRADER: PTC INJECTING UTILITY JINDAL WR GRID MSEDCL DRAWEE UTILITY MSEDCL HVDC BACK TO BACK AT BHADRWATHI IN WR INTERVENING REGIONAL LINK SR-WR INTERVENING STATE TRANSMISSION UTILITY KPTCL CAPACITY APPROVED 100 MW JINDAL DAILY PERIOD 0000 HRS – 2400 HRS
STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP EXPORT AT JINDAL 100 MW LOSSES IN KPTCL 4.06% WR GRID MSEDCL AT KPTCL PERIPHERY 95.9 MW HVDC BACK TO BACK AT BHADRWATHI IN WR LOSSES IN SR 3.50% AT SR-WR PERIPHERY 92.5 MW LOSSES IN WR 4% MSEDCL RECEIVES 88.8 MW JINDAL
STOA OF JINDAL- MSEDCL, 100 MW FROM 0000 HRS – 2400 HRS KAR AP APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 1000 FOR KPTCL WR GRID MSEDCL HVDC BACK TO BACK AT BHADRWATHI IN WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 757.04 FOR CTU-SR • Rs 1114.72 FOR SR-WR LINK • Rs 345.1 FOR CTU-WR • Rs 757.04 FOR KPTCL JINDAL TOTAL TRANSMISSION CHARGE PER UNIT 12.5/. Ps… Details
IPP CASE KAYAMKULAM CCGP, NTPC to PSEB 150 MW for 31 days on Round the Clock basis
SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB NR CUSTOMER: NVVNL TRADER: NVVNL HVDC BACK TO BACK AT VINDHYACHAL IN WR INJECTING UTILITY KYCPP,KSEB DRAWEE UTILITY PSEB WR INTERVENING REGION WR HVDC BACK TO BACK AT BHADRWATHI IN WR • INTERVENING REGIONAL LINK • SR-WR • WR-NR INTERVENING STATE TRANSMISSION UTILITY KSEB KERALA CAPACITY APPROVED 150 MW DAILY PERIOD 0000-2400 HRS KAYAMKULAM CCGT(NTPC)
SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB NR EXPORT AT KYCPP BUS 150 MW HVDC BACK TO BACK AT VINDHYACHAL IN WR WR LOSSES IN KERALA 0.75% AT KERALA PERIPHERY 148.9 MW HVDC BACK TO BACK AT BHADRWATHI IN WR LOSSES IN SR 3.12% AT SR-WR PERIPHERY 144.3 MW LOSSES IN WR 4.0% KERALA AT WR-NR PERIPHERY 138.5 MW LOSSES IN NR 3.0% PSEB RECIEVES 134.4 MW KAYAMKULAM CCGT(NTPC)
SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION NR • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 3000 FOR NRLDC • Rs 1000 FOR KSEB HVDC BACK TO BACK AT VINDHYACHAL IN WR WR HVDC BACK TO BACK AT BHADRWATHI IN WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 757.04 FOR CTU-SR • Rs 1114.72 FOR SR-WR LINK • Rs 345.1 FOR CTU-WR • Rs 560.09 FOR WR-NR LINK • Rs 521.37 FOR CTU-NR • Rs 672.07FOR KSEB TOTAL TRANSMISSION CHARGE PER UNIT 16.8/. Ps… KERALA KAYAMKULAM CCGT(NTPC) Details