1 / 6

NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED

NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED EUREX PILOT REPROCESSING PLANT (ENEA - Saluggia Center) ITREC PILOT REPROCESSING AND REFABRICATION PLANT (ENEA - Trisaia Center) FN INDUSTRIAL FUEL FABRICATION PLANT (Bosco Marengo - AL) PLUTONIUN

bernad
Download Presentation

NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED EUREX PILOT REPROCESSING PLANT (ENEA - Saluggia Center) ITREC PILOT REPROCESSING AND REFABRICATION PLANT (ENEA - Trisaia Center) FN INDUSTRIAL FUEL FABRICATION PLANT (Bosco Marengo - AL) • PLUTONIUN • PILOT FUEL FABRICATION PLANT • OPEC • POST IRRADIATION EXAMINATION FACILITY • (ENEA -Casaccia Center)

  2. ITREC: pilot reprocessing and refabrication plant (U-Th fuel cycle) (ENEA - Trisaia Centre) • Main past activities: • 1975 -1978: reprocessing of Elk River • spent fuel (U-Th) • 1983 -1990: development and testing • of centrifugal contactors • 1995 - 2000: solidification of liquid • radioactive waste • Main decommissioning milestones: • (Ministry of Industry strategic guidelines) • within 2010: management of all radioactive • waste produced during the past activities • within 2016: decontamination and dismantling • of the plant, management of the resulting • material, free release of the site • Main decommissioning issues: • solidification of U-Th highly radioactive solution (reprocessing “final product”) • dry storage of residual spent fuel in dual purpose casks • decontamination and dismantling of equipment and hot cells

  3. OPEC : post irradiation examination facility (ENEA - Casaccia Centre) • Main past activities: • 1962-1990 : post-irradiation examination • of metal uranium and uranium • oxide spent fuels (up to 2000 Ci - 74 TBq) • 1992-1998 : spent fuel scraps encapsulation, • hot cells decontamination • Main decommissioning milestones: • (Ministry of Industry strategic guidelines) • within 2010 : safe management of all radioactive • waste and nuclear material produced during • the past activities • within 2016 : decontamination and dismantling • of the plant, safe management of the resulting • material, free release of the site • Main decommissioning issues: • removal of spent fuel scraps • management of residual radioactive waste • final decontamination and dismantling

  4. PLUTONIUM: pilot fuel fabrication plant (ENEA - Casaccia Centre) • Main past activities: • 1968-1974: process development (sol-gel) • 1977-1980: fuel fabrication for AECL • Chalk River reactor • 1990-1996: liquid radioactive • waste management • Main decommissioning milestones: • (Ministry of Industry strategic guidelines) • within 2010 : management of all radioactive • waste and nuclear material produced during • the past activities • within 2016 : decontamination and dismantling • of the plant, safe management of the resulting • material, free release of the site • Main decommissioning issues: • removal of residual nuclear material • decontamination and dismantling of glove-boxes • management of residual radioactive waste

  5. EUREX: pilot reprocessing plant (ENEA - Saluggia Centre) • Main past activities: • 1970-1975 : MTR (HEU) spent fuel reprocessing • 1980-1983 : CANDU spent fuel reprocessing • 1988-1991 : Pu nitrate-oxide conversion • (via sol-gel) • Main decommissioning milestones: • (Ministry of Industry strategic guidelines) • within 2010 : safe management of all radioactive waste • produced during the past activities • within 2016 : decontamination and dismantling of the • plant, safe management of the resulting material, • free release of the site • Main decommissioning issues: • solidification of all liquid radioactive waste • dry storage of residual spent fuel in dual purpose casks • decontamination and dismantling of equipment and hot cells

  6. FN: industrial fuel fabrication plant (ENEA - Bosco Marengo) • Main past activities: • 1973-1995 : fabrication of fuel assemblies for • Italian and foreign LWR • 1996-2001 : preparatory works • for decommissioning • Main decommissioning milestones: • (Ministry of Industry strategic guidelines) • within 2004 : decontamination and dismantling • of equipment, safe management of the • resulting material • within 2011 : controlled temporary storage • "in situ" of radioactive waste, transfer to the national • repository, free release of the site • Main decommissioning issues: • residual nuclear material removal • decontamination and dismantling of equipment and buildings

More Related