1 / 14

European Registration Centre

European Registration Centre. Overview June 2009. ERC – 2009 Issue Resolutions. No CoP Issues since last meeting. ERC – Reference Protocol. Since last meeting Two referencing issues addressed and resolved Total of 4 issues for 2008 One issue currently being considered.

berne
Download Presentation

European Registration Centre

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. European Registration Centre Overview June 2009

  2. ERC – 2009 Issue Resolutions • No CoP Issues since last meeting

  3. ERC – Reference Protocol • Since last meeting • Two referencing issues addressed and resolved • Total of 4 issues for 2008 • One issue currently being considered

  4. ERC – Reference Protocol • Current Issue under consideration • M111SL Reference Frequency • CEC method states run a reference ‘every 15 tests’ • Open to interpretation? 14 or 15 candidates? • History shows inconsistencies • Need QMWG feedback before contacting lab, if necessary

  5. ERC – Account Management • User Access • Has been restructured • Individual ID • Access given to each user as appropriate • Sponsor, Lab, Reference, QMWG, 646LA, etc. • No more Group Ids / passwords • Labs no longer need additional sponsor id

  6. ERC – ATC Data Requests • April Data Request • 501LA • Bore Polish, Oil Consumption • 646LA • Outlet & Inlet Cam Wear, Bore Polish, Cylinder Liner Wear • Re-issue in May • Max Bore Polish for 646LA • Piston Merits for 501LA, though later withheld

  7. ERC – Compliance • ATC User Concern • Letter of Intent • Possible ambiguity in wording • Refer to CoP, Forms B.1 and C.1

  8. ERC - Activity Levels • Fax vs. Online • Jan. ’08: 52% Fax • June ’08: 5% Fax • July - Nov. ’08: 3.5% Fax • 2009: 1.9 % • Future? • Expect faxes to be almost zero.

  9. ERC – Website Security • User Ids • Accounts and permissions authorized manually • Set expiration after specified time period of inactivity – 6 months? • Locked out with unsuccessful login attempts • Can be tied to computer IP address • Currently studying usage patterns • Can be customized for each account

  10. ERC – Requested Guidance • ERC Candidate Summaries • Parameters to Include? • Base on ACEA Specs? • Base on CEC? • Base on CoP?

  11. ERC – Discrimination Charts • Date Issue has been corrected.

  12. ERC – Discrimination Charts

More Related