90 likes | 257 Views
IEEE 802.21 Motions in July Plenary DCN: 21-11-0129-00-0000 Title : Request for Sponsor Ballot Approval for IEEE 802.21a Date Submitted: July 20, 2011 Presented at EC Closing Plenary, July 2011 Authors or Source(s): Subir Das , Telcordia Technologies Inc
E N D
IEEE 802.21 Motions in July Plenary DCN: 21-11-0129-00-0000 Title: Request for Sponsor Ballot Approval for IEEE 802.21a Date Submitted: July 20, 2011 Presented at EC Closing Plenary, July 2011 Authors or Source(s): Subir Das, Telcordia Technologies Inc Juan Carlos Zuniga, InterDigitalCorporation Abstract: This document contains WG Letter Ballots summary and motions for Sponsor Ballot approval
Topic Request for EC Approval to forward the IEEE P802.21a for Sponsor Ballot Slide 2 Subir Das, Chair IEEE 802.21
IEEE P802.21a WG Ballot Result- Final Round • • Date the last ballot closed: July 5th, 2011 • • Vote tally including Approve, Disapprove and Abstain votes: • Ballot Pool = 32, Return ratio= 29 (90.63%), # of comments = 17 (T-2, E-15) • Number of Approves = 29 • Number of Disapproves = 0 • Number of Abstains = 0 • Approval Ratio = 100% • • Comments that support the remaining disapprove votes and Working Group responses – N/ A Subir Das, Chair, IEEE 802.21
IEEE P802.21a Draft History and Statistics MEC Review is available at : https://mentor.ieee.org/802.21/dcn/11/21-11-0113-00-0000-802-21a-mec-review.docx Slide 4 Subir Das, Chair, IEEE 802.21
Links to WG Letter Ballot Results • WG LB #5: • https://mentor.ieee.org/802.21/dcn/10/21-10-0258-00-0000-lb-5-result.xlsx • WG LB #5a: • https://mentor.ieee.org/802.21/dcn/11/21-11-0023-00-0000-lb-5a-vote-summary.xls • WG LB #5b: • https://mentor.ieee.org/802.21/dcn/11/21-11-0070-00-0000-letter-ballot-5b-results.xls • WG LB #5c: • https://mentor.ieee.org/802.21/dcn/11/21-11-0107-00-0000-letter-ballot-5c-results.xls Slide 5 Subir Das, Chair, IEEE 802.21
Links to WG Letter Ballot Comments • WG LB #5: • https://mentor.ieee.org/802.21/dcn/11/21-11-0003-04-0sec-lb5-comments.xls • WG LB #5a: • https://mentor.ieee.org/802.21/dcn/11/21-11-0024-05-0sec-lb5a-comments.xls • WG LB #5b: • https://mentor.ieee.org/802.21/dcn/11/21-11-0071-03-0sec-lb5b-comments.xls • WG LB #5c: • https://mentor.ieee.org/802.21/dcn/11/21-11-0110-00-0sec-lb5c-comments.xls Slide 6 Subir Das, Chair, IEEE 802.21
Tentative Time-line for P802.21a Sponsor Ballot • The Sponsor Ballot Pool formation is currently under way • Aug 2nd, 2011 – Sponsor Ballot #1 Starts • Aug 31st, 2011 – Sponsor Ballot #1 Ends • September 19-22– Address and Resolve Comments • October 2011 – Sponsor Ballot recirculation • November 2011 – Sponsor Ballot recirculation Slide 7 Subir Das, Chair, IEEE 802.21
P802.21 WG Motion Move to authorize the P802.21 WG Chair to make a motion to the IEEE 802 Executive Committee for approval to forward the IEEE 802.21a Draft for Sponsor Ballot Move: Yoshihiro Ohba Second: Anthony Chan For: 09 Against: 00 Abstain: 00 Motion Passes Slide 8 Subir Das, Chair, IEEE 802.21
Motion Motion: To forward IEEE P802.21a for Sponsor Ballot Move: Subir Das Second: Roger Marks For: Against: Abstain: Motion Slide 9 Subir Das, Chair, IEEE 802.21