1 / 14

Press Meeting • March 28, 2012

BRATTLEBORO MEMORIAL HOSPITAL Emergency Department Renovation/Expansion & Magnetic Resonance Imaging Purchase/Installation. Press Meeting • March 28, 2012. Project Description. Purchase and upgrade the currently leased 1.5 T MRI and move from a trailer to a fixed location

beryl
Download Presentation

Press Meeting • March 28, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRATTLEBORO MEMORIAL HOSPITALEmergency Department Renovation/Expansion & Magnetic Resonance Imaging Purchase/Installation Press Meeting • March 28, 2012

  2. Project Description • Purchase and upgrade the currently leased 1.5 T MRI and move from a trailer to a fixed location • Expand and modernize the Emergency Department • Renovate 8,500 existing sq. ft. and construct 2,500 sq. ft. of new space in front of BMH • Create separate entrances for ED walk-in patients and ambulance admissions • Slightly enlarge current front drop off with new canopy, providing a focal point for the new lobby and ED • Add 6 parking spaces for improved access

  3. MRI Statement of Need • Current MRI location obstructs the ED expansion • MRI patients must travel through the ED • MRI patients are interviewed in a poorly heated/cooled external corridor • Access for handicapped patients is poor • MRI upgrade will improve imaging quality by: • updating computer software • replacing the current gradients with larger, more powerful gradients (Gradients are the electronic coils that allow the MRI to focus on a specific part of the body.)

  4. Project Description-MRI • MRI located in a trailer on a pad next to the ambulance dock • Existing magnet and much of the housing will be recycled and moved to existing shell space in the Richards Building • MRI shell space was constructed as part of the CON approved in 2007 • The computer software will be upgraded in line with advances in the technology that have occurred since the unit was leased 4 years ago

  5. ED Statement of Need • Issues include: • Privacy issues and HIPAA compliance at patient check-in • Limited ability to handle patient surges, requiring utilization of hall stretchers • Lack of dedicated room for decontamination of patients • No patient toilet room in the clinical area (some exam rooms have dedicated toilet rooms) • Current ED is too constrained to efficiently and effectively treat patient volume • Physical layout presents multiple challenges to streamline patient flow resulting in long waits • 72% of the hospital’s admissions come through the ED

  6. Project Description-ED • New ED will consist of enhanced patient support and treatment areas : • 10 treatment beds including 2 Rapid Treatment rooms for triage and treatment for minor illness and injury • 2 behavioral health safe rooms • EMS work room • Decontamination area • Larger, improved waiting area

  7. Project Description-ED

  8. ED Statement of Need • Need is not just for more space, but the right kind of spaces • No physical separation between ambulatory/walk-in patients and ambulance traffic • Heating, ventilation and air conditioning system does not provide adequate fresh air ventilation based on current standards • MRI patients presently walk through ED for their scans • From FY 2000 through FY 2010, ED experienced 13% increase in annual visits • In FY 2011, ED provided approximately 13,000 visits. Based on current standards published by the American College of Emergency Physicians, our six bed ED should serve 7,200 visits

  9. Architect Diagrams

  10. Timeline • Refine the final design • Hire a general contractor/construction manager • Act 250 approval • Local permitting • Conduct a capital campaign feasibility study • Fall 2012 groundbreaking • Goal 15 month completion date

  11. Total Project Costs

  12. Communications Plan • Every Friday Rob Prohaska will outline upcoming plans for the following week • These updates will be posted every Monday starting in April on a dedicated BMH blog • Posted on social media • Facebook • Pinterest • Twitter

  13. Team • Steven R. Gordon, BMH President & CEO • Rob Prohaska, BMH Director of Plant Services • Lavallee Brensinger Architects • Construction Manager, to be announced

  14. Thank you for coming! Questions?