190 likes | 377 Views
Cory Pope P.E. Utah Department of Transportation Transportation Asset Management: Utah’s Journey. “There are never enough r esources”. Outline for Today’s Presentation. UDOT’s Asset Management Strategic direction and performance measures History and status of asset management program
E N D
Cory Pope P.E. Utah Department of Transportation Transportation Asset Management: Utah’s Journey
Outline for Today’s Presentation • UDOT’s Asset Management • Strategic direction and performance measures • History and status of asset management program • Future direction of asset management • Challenge to the industry
Performance Measures Report to Governor, Legislators & Public Strategic Direction
Strategic Goals • Preserve Infrastructure • Optimize Mobility • Improve Safety • Strengthen the Economy
Preserve Infrastructure “Good Roads Cost Less” • Make it Part of Your Culture • First of the Final Four Preserve Infrastructure • Keeping Assets in Good Condition • Well-timed Treatments
Summary • We identified what is important to meet our goals • We use measures for those goals • Invested money to improve those measures • Making a positive difference in Utah’s Transportation
Asset Management History at UDOT • Developed “Good Roads Cost Less Philosophy • “Plan for Every Section”
Self Assessment Survey Gap Analysis Three-day Asset Management Workshop-2001 Gaps between desires/goals and reality • Resulted in- • Setting agency priorities for asset management philosophy • Improved performance management • Goals and Priorities are Still Relevant Today
UDOT Asset Management • “It is a Journey – Start Slow and With What You Know” • “It is a Journey – Continuous Improvement”
Pavement Data Collection • IRI - Longitudinal Profile • Distress - Line-scan Cameras • Rut – 3D Laser • Crack Measurement – cameras & line lasers • Right-of-Way Digital Imaging
Pavement Condition Historical – Projected (Level 2 – 2,735 miles) (Level 2 – 2,735 miles) * Governor’s proposed 2013 budget
Next Steps Further Refine Bridge Model Develop Cross Asset Analysis for Structures/Bridge Incorporate Safety into the Pavement/Bridge Cross Asset Analysis Tradeoff Analysis Are you spending your money the best way possible? • Pavement • Developed • Maintenance Strategies • Cost/Benefit • Funding, Targets • Future Condition • Bridge • Beta Developed • Maintenance Strategies • Cost/Benefit • Funding, but not Targets • Future Condition
Next Steps – All the Other Assets • Traffic, Structures, Maintenance, Motor Carriers, Asset Management • Systematic Collection • One Pass • Many Assets • Integrated Data • Common Workstation • Exportable Files
Challenge to Industry • Seamless Integration between multiple vendors • Tools for improved data entry/gathering • Support for performance-based contracting • Tools for performance-based budgeting