An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recalculate Standard Costs Alan Chorney Professional Services Visual South, Inc.

  2. Choosing Parts to Recalc • Select ALL includes Fabricated as well as Purchased • Select CERTAIN parts holding down CTRL key and click on line

  3. Receipt Selection Option • Defines period VISUAL calcs average receipt value • Enter a start & end date to get average of PO receipts • Use latest receipt if no receipt • Use this option for last PO receipt value rather than average • Use tomorrow’s date (cannot have receipts tomorrow therefore uses last receipt)

  4. Filter Results • Show Changes only – filters just those parts where the results differ from current part master value • Further filter by % variance or dollar variance • Available only after clicking on RECALC SELECT PARTS

  5. Updating Part Maintenance • If desired, PRINT results to see value change • Only applicable in a standard environment • In actual existing FIFO layers do not change • Save will update Part Maintenance with new standards • If there are some parts that you do not want to update, double click on “check mark” to remove check mark

  6. Fabricated Parts • This function can recalc fabricated parts as well as purchased • Be aware that recalcing Fabricated parts could set a part maintenance value that differs from the parts engineering master

  7. Fabricated Parts-Material • Suggest recalcing raw material(RM) parts only • Once RM costs updated, “Push down” updated RM costs to Engineering Masters • Under Part Maintenance, Maintain, Reset Matl Requirement costs • Updates costs on RM cards

  8. Fabricated Parts-Labor & Burden • Change standard hourly rates and burden rates/% on shop esources • ENG/MFG, SHOP RESOURCES • Make changes manually or thru update queries, etc. • “Push down” updated Labor/Burden costs to Engineering Masters • Under EDIT, RESET OPERATION COSTS • Updates costs on Operation cards • Updates costs on RM cards

  9. Fabricated Parts-Outside Services • Change standard costs for each Outside Service • ENG/MFG, OUTSIDE SERVICE MAINTENANCE • Make changes manually or thru update queries, etc. • “Push down” updated Service costs to Engineering Masters • Under MAINTAIN, RESET OPERATION COSTS • Updates costs on Outside Service cards

  10. Update Part Mainenance • The above steps updated Eng Masters with updated costs • Now update Part Master with updated costs from Eng Masters • Under PART MAINTENANCE, MAINTAIN, IMPLODE COSTS • Implode goes out to Eng Masters to get updated costs

  11. Implode Cost Settings • Select ALL or selected parts to IMPLODE • Multi-Level - controls how Implode Costs follow chains of fabricated parts • If selected, costs are imploded recursively for each fabricated part required in the eng master, until only purchased parts are found • If not selected, Costs associated with the material requirements are used directly as is • The Permanently Save option controls if the recursive implosion is permanently saved in each part master at each part level

  12. Thank You • alan.chorney@visualsouth.com