310 likes | 565 Views
MURK Presented By Awni Alsous, MURK Engineer 2010 . What is MURK?. MURK - Manual for Uniform Record Keeping Manuals containing uniform contract record keeping forms and procedures to be followed by the Engineer, current on the date of the contract award.
E N D
MURK Presented By Awni Alsous, MURK Engineer 2010
MURK - Manual for Uniform Record Keeping • Manuals containing uniform contract record keeping forms and procedures to be followed by the Engineer, current on the date of the contract award. • The MURK manuals are guidance documents, and are not a part of the contract documents.
MURK Part 1A – (CAM) The Contract Administration Manual • Contains guidance on the administration of the general provisions contained in the Standard Specifications along with Contract Civil Rights Compliance Reviews.
MURK Part 1B – (CIM) The Construction Inspection Manual • Contains guidance on field inspection duties, responsibilities and record keeping requirements.
MURK Part 1C – The Construction Division Safety and Health Program Manual • A comprehensive reference to all aspects of the administration of safety and health requirements on Department contracts. • Applies to contractor’s construction operations, to program staff, and to the construction inspection consultants’ staff.
MURK Part 1D – Construction Consultant Manual • Provides guidance to Department staff on the management of consultants in construction.
MURK Part 2A – (MIM) Materials Inspection Manual • Provides guidance for inspectors on how to determine the acceptability of materials arriving on a project site.
Locate the manuals • All of the preceding manuals can be located on the Construction Division web site • www.nysdot.gov
Diary and Inspector Reports • These are two of the most important components of the project records • Required information is extensive and is listed in the Construction Administration Manual (MURK 1a) Section 90.
Owner/DOT/FHWA Review • Owner/NYSDOT Review • Check for proper record keeping procedures • MURK 40 form (on Construction Division Website) • 6 Page Check List for records review
MURK 40 Page 1
MURK 40 Page 2
MURK 40 Page 3
MURK 40 Page 4
MURK 40 Page 5
MURK 40 Page 6
FHWA Review • American Recovery and Reinvestment Act (ARRA) • Construction Monitoring Checklist • 2 pages
ARRA Page 1
ARRA Page 2