1 / 8

TCU VIA – S19

TCU VIA – S19. 4th Semester. introduction. Group- / Teamwork WBS – Work Break down Structure Contractors / T rades Costs + Profit / Margin The Bid. GROUP- / TEAMWORK. 4 individual persons. Joan Chen. Faye Wong. Bruce Lee. CoCo Lee. One unit. WBS.

bethany
Download Presentation

TCU VIA – S19

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wbs, CONTRACTORS & GIVING A BID TCU VIA – S19 4th Semester introduction Group- / Teamwork WBS – Work Break downStructure Contractors / Trades Costs + Profit / Margin The Bid

  2. GROUP- / TEAMWORK 4 individual persons Joan Chen Faye Wong Bruce Lee CoCo Lee One unit WBS

  3. Wbs - Scrutinizingthe revit model Set-up site Takedownsite Roofs Water installations Ventilation Heat installations Ceilings Tilework Subfloorsfor tiles Sanitary Plumbing Sewersystem Outer walls Partition walls Woodenfloors Subfloors for Woodenfloors Windows Stair Deck elements Power instalaltions Electric equipment Caseworks (kitchen and cabinets) Removingsoil Excavation Grass, bushes & trees Externaldoors Internaldoors Foundations Ground-surportedfloors WBS

  4. Wbs - Trades / CONTRACTORS Electrical Works Carpentery Works Sanatary & Ventilation Works Landscape Works Concrete Works Masonry Works Concrete Elements Works Roofs Ceilings Woodenfloors Subfloors for Woodenfloors Windows Externaldoors Internaldoors Stair Caseworks (kitchen and cabinets) Set-up site Takedown site Removingsoil Excavation Grass, bushes & trees Outer walls Partition walls Tilework Subfloorsfor tiles Deck elements Concrete elements Power instalaltions Electric equipment Foundations Ground-surportedfloors Sanitary Plumbing Sewersystem Ventilation Water installations Heat installations WBS

  5. Group- / teamwork Electrical Works Carpentery Works Sanatary & Ventilation Works Landscape Works Concrete Works Masonry Works Concrete Elements Works Roofs Ceilings Woodenfloors Subfloors for Woodenfloors Windows Externaldoors Internaldoors Stair Caseworks (kitchen and cabinets) Set-up site Takedown site Removingsoil Excavation Grass, bushes & trees Outer walls Partition walls Tilework Subfloorsfor tiles Deck elements Concrete elements Power instalaltions Electric equipment Foundations Ground-surportedfloors Sanitary Plumbing Sewersystem Ventilation Water installations Heat installations Distribute the work evenly in the group WBS

  6. Group- / teamwork Electrical Works Carpentery Works Sanatary & Ventilation Works Landscape Works Concrete Works Masonry Works Concrete Elements Works Costprice Costprice Costprice Costprice Costprice Costprice Costprice TOTAL COST PRICE + Profit / Margin THE BID WBS

  7. GROUP- / TEAMWORK One unit WBS

  8. Questions? Functionalanalysis VIA University College

More Related