An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building Management Simulation Center B. de Vries, S. Verhagen, A.J Jessurun

  2. What is the BMSC • Training Center • Construction Management • User Interaction • Full Scale Model

  3. BMSC

  4. Construction Management Changes • More emphasis on planning instead of controlling • More pre-active instead of re-active construction management

  5. Construction Management Training • Not adequate for the new type of construction manager • On the building site • Dependent on the project and on the trainer • Difficult to measure acquired knowledge and expertise

  6. Course System:Project data Project Exercises Transition Type Activity Score Rule

  7. Transitions • Transition types (7) : Project dependent • Activities (100) : Project independent • If All(Activity) = Fulfilled then Transition = OK • If Activity(i) = Fulfilled then Activity(j,k,..)=OK • Scores : Ranges

  8. Course System:Trainee data Score Rule Trainee Session Log Record

  9. System Requirements • Minimal data entry effort • Maximal data reliability • Maximal data accuracy • Minimal trainer’s interference

  10. BMSC course system • Building site • Site hut • Control room

  11. BMSC floor plan

  12. User interaction • Communication console (PC) • VR model on parabolic screen • Actors: role play of truck driver, etc.

  13. Student interface

  14. Teacher interface • Log record of trainees’ actions • Scenario for actors • Television monitors

  15. Training evaluation • Transition types > Activities • Evaluation aspects: Time, Cost, Quality, organization, Information > Scores • Construction knowledge > Expert • Management knowledge > Expert

  16. Pro High level of realism Intense courses Toolkit is very generic Con Communication console in no substitute for phone Unforeseen actions are missing First Experiences

  17. To Conclude