110 likes | 285 Views
James Webb Space Telescope Update. Eric P. Smith Deputy Director, JWST Program NASA Science Mission Directorate. 2010 Programmatic Events. TAT: Test Assessment Team ICRP: Independent Comprehensive Review Panel. NASA TAT Responses. ICRP Recommendations (1). Baseline Funding
E N D
James Webb Space Telescope Update Eric P. Smith Deputy Director, JWST Program NASA Science Mission Directorate
2010 Programmatic Events TAT: Test Assessment Team ICRP: Independent Comprehensive Review Panel AAS 217th Meeting
NASA TAT Responses AAS 217th Meeting
ICRP Recommendations (1) • Baseline Funding • NASA did not establish an adequate cost and schedule baseline at JWST’s Confirmation Review milestone, and recommended four specific steps be taken to establish a realistic baseline. AAS 217th Meeting
ICRP Recommendations (2) • Independent Analysis Capability • NASA Headquarters should have a robust independent cost and program analysis capability, and recommended a stronger role for the Office of Independent Program and Cost Evaluation (IPCE). AAS 217th Meeting
ICRP Recommendations (3) • Program and Project Management • Recommended that JWST be elevated to a new organizational entity at Headquarters • Implementation phase of JWST project requires a different management approach than the Formulation phase AAS 217th Meeting
HQ Management Changes WAS IS AAS 217th Meeting
GSFC Management Changes WAS IS AAS 217th Meeting
ICRP Recommendations (4) • Additional Items • NASA program/project governance policy • Program, Project, Industry communication • Potential Risk in Integration and Test • ICRP Endorsed findings of the TAT • System Engineering • Establish a plan that provides the required level of experience and involves appropriate prime contractor personnel before changing system engineering accountability • Project Scientist and Science Team • Recommend this role be strengthened AAS 217th Meeting
Steps to A Launch Date AAS 217th Meeting
End AAS 217th Meeting