An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLICK TO ADD TITLE The 6th Global Health Supply Chain Summit November 18 -20, 2013Addis Ababa, Ethiopia Use of a Supply Chain Management Portal to Ensure an Uninterrupted Supply of Contraceptives in Bangladesh Mohammed Golam Kibria, Senior Technical Advisor SIAPS - Bangladesh [SPEAKERS NAMES] [DATE]

  2. Introduction and Background The USAID/SIAPS program is working in collaboration with the (MoHFW) in Bangladesh to improve: Procurement management - processes and tools Logistics management and Information system of FP commodities Forecasting and supply planning for product availability Informed decision making on stock situation of FP commodities Monitoring progress and performance of the supply chain

  3. Problem Statement • The Bangladesh MOHFW identified the availability, quality and use of data as key factors in improving supply chain performance for family planning commodities • Available and accurate data is critical for: • making informed decisions on FP commodities • monitoring performance of the supply chain • improving availability and use of products

  4. Process to Establish the Portal • FP supply chain system review, options analysis, and redesign • Conceptualize and design the SCMP • Introduce the electronic data management system • Improve paper based system to improve the quality of data entered in the electronic system • Improve documentation at all levels • Improve system and redesign (e.g. transition of the e-system from SCIP to SCMP) • Facilitate an enabling environment

  5. Rationale for Portal Development To improve data availability and visibility To establish a “visible” procurement process tracking to monitor milestones and avoid procurement delays To monitor use of information for decision making and troubleshooting

  6. SCMPortal – At a Glance MOHFW’s web-based portal: Includes a wide range of features to manage procurement processes from planning to the receipt of commodities. Accessible to the MOHFW and stakeholder decision-makers at various levels https://scmpbd.org/ Procurement Tracker Landing page of the SCMP

  7. MOHFW Supply Chain Workflow

  8. Progress to Date Improved monitoring of procurement packages through an interactive management dashboard Established system automated trigger alerts through e-mails and SMS Increased access to information on procurement delays and bottlenecks thus facilitating management decision making Expedited tracking and management of procurement for more than 90 percent of goods and services Enhanced transparency and accountability of procurement process Extended for use with other health commodities

  9. Notable Success Reduced procurement lead-time for family planning and other health commodities

  10. National Stock Status of Contraceptives Fewer stock-outs (<5%) of IUDs while nearly no stock-outs (<1%) of injectables for last two years. indicates < 4 months indicates 4-7.9 months indicates >=8 months Reference: M G Kibria et.al, 2013, Impact of a Computerized Inventory Management System in Ensuring Commodity Security of Contraceptives in Bangladesh

  11. Milestones • Process of transferring hosting of the portal to the MOHFW • Government officials track the status of procurement packages and ensure the packages’ smooth progress. • Procurement performance has improved • Efficiency, effectiveness, and transparency at the central level.

  12. Benefits Improved access to information to support decision-making Enhanced central data repository for procurement and logistics of health commodities Computerized supply chain management systems has reduced stock-out rates in Bangladesh Contributes to improve demand forecasting, fund-gap analysis, supply planning and the promotion of decentralized decision making. Discussion among donors on allocation of funding for informed procurement

  13. Challenges • Lack of clarity on procurement roles at the central level • Ensure timely update of procurement process data • Timely actions required based on information • Existing budget approval process (administrative & financial) • Improving the ICT infrastructure at all levels

  14. ধন্যবাদ