230 likes | 353 Views
Assistive Technology for Promotional Calendar Production Improvement Proposal. Eric Hoffmann, Lisa Furby, Ronnie Mays, Samir Shah, Whitney Belt. Assistive Technology for Promotional Calendar Production Improvement Proposal. Saluki Engineering Company Team Members:
E N D
Assistive Technology for Promotional Calendar Production Improvement Proposal Eric Hoffmann, Lisa Furby, Ronnie Mays, Samir Shah, Whitney Belt
Assistive Technology for Promotional Calendar Production Improvement Proposal Saluki Engineering Company Team Members: Eric Hoffmann (Project Manager), Whitney Belt, Lisa Furby, Samir Shah, Ronnie Mays Jr. Faculty Technical Advisor: Dr. James Mathias Nonprofit Organization Sponsor: Specialized Training for Adult Rehabilitation in Murphysboro, IL START Client: Carl Hartmann
Outline EH • Executive Summary • Project Organization • Organizational Chart • Project Chart • Draft Schedule 2010 • AIL • Resources Needed • Project Description • Subsystems • Summary
Project in conjunction with AbilityOne Challenge sponsored by NISH Team works with a nonprofit organization (START) as part of the competition. Project involves designing and building a device that can be used to affix a calendar to a vinyl promotional pad Design jig and mechanical advantage mechanism, incorporate standard stapler, with ergonomic and economical consideration Use of training aids to assist employees in learning to do job correctly Executive Summary LF
An applied science that coordinates the design of devices, systems, and physical working conditions with the capacities and requirements of the worker Workers with Disabilities Occupational Therapy START Ergonomics RM
Ergonomics RM Mechanical advantage needed Functioning prototype START employee production 95% accuracy
Fastens calendar pad to vinyl sheet Current system inefficient Proposed system Staplers Types Criteria looking for in stapler Proposed best choice Stapling Mechanism WB
Staples Types Criteria looking for in staples Proposed best choice Deliverables Reliability comparison of staplers Performance comparison of staples Force required to operate stapler Stapling Mechanism WB
Intro to M.A. Lever arm discussion Force Evaluation Increased force out for a given force in. Mechanical Advantage SS
Mechanical Advantage SS • M.A. % (M.A.>1) • Ratio of speed and range of motion to M.A. • Force increase requirement • Stress analysis at joints • CAD measurement design
Jigs and Fixtures EH • Workpiece locating and holding device. • Quality product production • Material selection • Durability • Machinability • Cost • Tolerances • Gap tolerance • Straightness • Length
Jigs and Fixtures EH • Correctly place calendar on vinyl with 2mm boarder • Durable construction • Integrated stress analysis • Ergonomic testing with START • 95% product placement accuracy
Use training aids (manuals and videos) and job aids posters) Help increase productivity of employee and product quality Training aids and job aids made with consideration of needs of START employees Collaboration with experts in Curriculum and Instruction in order to develop training aids and job aids Training Aids LF
Analyze considerations of learning styles vs. disabilities of the clients Step by step use of prototype to ensure thorough training manual and video Training Video Training Manual Posters (Job Aid) Training Aids LF
An important goal of this project is to increase the quantity of calendars that are made correctly. This could allow increased profit or additional workers Economical Analysis to compare production of calendars now as opposed to after the implementation of the device Economical Analysis LF
As part of the NISH AbilityOne Challenge, team will work with START to design an assistive device Device will allow START employees to staple calendar to promotional vinyl backing Ergonomic and Economic consideration Training Aids and Job Aids will be utilized help increase productivity Goals to increase number of employees that can perform job, increase wages Summary RM