Arthur Adrian Hooke July 10, 1944 - January 7, 2013

Arthur Adrian Hooke July 10, 1944 - January 7, 2013. CCSDS Founder. Project Manager JPL

Download Presentation

Arthur Adrian Hooke July 10, 1944 - January 7, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arthur Adrian Hooke July 10, 1944 - January 7, 2013 CCSDS Founder Project Manager JPL Adrian served as dual roles within the CCSDS, both as Chairman of the CCSDS Engineering Steering Group (CESG) and as Technical Lead for Networking Architecture, Technology and Standards in the Space Communications and Navigation office at NASA Headquarters.

  2. Administrative Overview Registration will be set up near a central location on Monday morning and will also double as the Secretariat area through the rest of the week. Meeting and break schedules will be as follows: Start time          08:45 Coffee break   10:30-10:50 Lunch Break    12:30-13:30 Coffee Break   15:30-15:50 End time 18:00 Beverages will be available in the foyer during the morning and afternoon breaks. Lunch will be on your own from 12:30-13:30 on the 3rd floor. A special lunch rate has been negotiated with Darmstadtium: 5.8 € / lunch (starter and main course or main course / desert + soft drink + coffee) Please let the Secretariat staff know as soon as possible if you will not be using your meeting room at your scheduled time. NICK: Update

  3. Administrative Overview Wireless Internet is available in all the meeting rooms and throughout Darmstadtium: Login (ESOC2012) and Password (CCSDSESA). WG Chair will get the key of his meeting room and is responsible to lock it. In case of problems in your meeting room (beamer, wireless, temperature, etc.) please call 200 using the room phone. Beamers do not have a high resolution. Please set up your notebook resolution to 1024 x 768 30th CCSDS Birthday: Dinner on 18th April 2012 at 7 pm in Orangerie Hall Map was included in the Registration Package Soft and alcoholic drinks to be paid at the bar by each attendee Mineral water will be available free of charge on the tables Parking fee for participants People arriving by car will collect their ticket from the machine when entering the car park. Max ceiling/day is 15 Euro. NICK: Update

  4. CCSDS Technical Editors: “Boot Camp” Tom Gannett - CCSDS Chief Technical Editor The purpose of the technical editor “boot camp” is to improve overall quality and enable faster processing of documents submitted to the Secretariat by familiarizing working group technical editors with CCSDS requirements for technical content, publication style and procedures for document submission. Tom: Update IT IS MANDATORY THAT ANY PERSON WHO IS ASSIGNED TO BE THE EDITOR OF A CCSDS DOCUMENT MUST ATTEND A BOOT CAMP. This week, Boot Camp sessions are scheduled as follows: Session Room Tuesday, 13:30 - 18:30 Thursday, 13:30-18:30 Suite 418 Suite 418

  5. Upcoming Meetings • Visa letters: now being provided for the next meeting. Available 6 months in advance – get yours NOW for Fall 2013 from Nick Tongson (CCSDS Secretariat) at the registration desk

  6. CCSDS Outreach – Everybody’s Job • All CCSDS team members should be campaigning for adoption of CCSDS standards by their organization’s missions • Many tools are available on the CCSDS website • www.ccsds.org > About > CCSDS Overview Materials • Brochures are available for you to hand out • See the Secretariat – may need to be mailed to you

  7. CCSDS Overview Systems Engineering • Security • Space Assigned Numbers Auth. • Delta-DOR • Timeline Data Exchange BoF • XML SIG MISSION CONTROL CENTER • Typical Mission Profile End Users • One Organization’s Assets Applications/Archives MISSION CONTROL CENTER End Users • Another Organization’s Assets Spacecraft Onboard Interface Services Space Link Services Cross Support Services Space Internetworking Services Mission Ops & Info Mgt Services • RF & Modulation • Space Link Coding & Sync. • Multi/Hyper Data Compress. • Space Link Protocols • Next Generation Uplink • Space Data Link Security • PlanetaryCommunications • Optical Coding and Mod • Onboard Wireless WG • Application Supt Services (incl. Plug-n-Play) • CS Service Management • CS Transfer Services • Cross Supt Service Arch. • AsynchonousMessaging • Motion Imagery & Apps • Delay Tolerant Networking • Voice • CFDP over Encap • Data Archive Ingestion • Navigation • Spacecraft Monitor & Control • Digital Repository Audit/Certification • Telerobotics • Working Group (producing standards) • Birds-Of-a-Feather stage (pre-approval) • Special Interest Group (integration forum) Six Areas Twenty-Eight working groups

  8. CESG Open Issues & more • CESG wants to thank all WGs and Areas for the effort done when completing all resources in the FW CWE • Please add resources still missing on existing Projects • Please adjust your schedule (in particular for “behind schedule” projects) • Open Issues to be discussed at CESG meeting on Friday 19th April • CCSDS Presentation at IOP-3 (Inter-Operability Plenary) • CCSDS Strategic Plan • Project schedule (in particular “bad projects” with long delays) • PICS / ICS • CESG Poll governance • WG creation poll (resources, need of CCSDS cost model) • ICPA (IOAG CCSDS Product Agreement) Please check at WG level • Guidelines for BOF / WG creation in order to mitigate potential overlaps • Boot Camp schedule • Room scheduling / registration opening times (less time for one or more for the other one) Currently: - 4w for Registration -8w room scheduling • Alert / notification when a book is put on line • Location of future CCSDS Technical Workshops • Abstracts for Space Ops 2014

  9. CESG Open Issues & more • CESG Polls since last meeting (Oct 2012) • Publication • 10 GBs, 3 BBs, 2 MBs, 1 Technical Corrigendum • Reconfirmation of DAI WG old set of standards • Agency Review • 4 RBs • At work after Agency Review • 8 RBs, 5 Pink sheets • Creation of TeleroboticsWG • CMC Polls since last meeting (Oct 2012) • Publication • 6 GBs, 4 BBs, 6MBs • Agency Review • 2 RBs • Projects • 6 Approved + 1 Deleted + (poll end Mar 13) Whole FW • IP over CCSDS + AMS WGs dissolved • New Code of Conduct • New CESG chairs appointed • Nestor Peccia (ESA) CESG Chair • Wallace Tai (NASA/JL) CESG Co-chair

  10. SEA Meeting Objectives • SEA • CCSDS Procedures Manual Discussion of PICS, ICS, and Profile ICS updates to CCSDS A02.1-Y-3 • Security WG • Security Architecture (MB) Published Nov 2012 • Security Algorithm (BB) Encryption & Authentication BB, published Nov 2012 • Link Layer Security (BB) Joint with SLS, RID processing • Key Management (GB, MB) GB published Nov 2011, MB draft in work • Security Green Books Several in revision now • Standard security section Mandatory • Delta-DOR WG • Overview document (GB) WB, Draft in work • Standard practice (MB) MB, CCSDS 506.0-M-1publishedApril 2011 • Data Exchange standard (BB) RB, RID resolution, prototyping in process • SANA Steering Group (SSG) • SANA Steering Group (SSG) Active, meeting this week • CCSDS Candidate Registries Moving CCSDS SCID and MACAO to SANA as official registries, NSSDC remains as registrar • XML Standards & Guidelines (XSG SIG)SIG restarted • CCSDS RFC & XML guidelines Active, meeting this week • Timeline Data Exchange (TDE) BoFBoF work initiates • TDE Charter & White Paper Active, meeting this week

  11. MOIMS Meeting Objectives • DAI WGs (not physically meeting, only via telecons) • PAIS (Producer-Archive Interface Spec) – Agency Review completed 6th April RIDs Review • OAIS – CESG Comments Discussion • NAV WG • Conjunction Data Message (CDM); in Agency review (due 18thJune 2012)Review • Navigation Green Book V.4 Review • TDM 5-year Review Discussion • Pointing Request Message (PRM) WB Review • Navigation Hardware Message (NHM) WB Review • S/C Maneuver Message (SMM), WB Review • Events Message (EVM), Requirements and WB Review • Liaison with SM&C • SM&C WG • Common and M&C Services Discussion • OPS-SAT (ESA), TechDemoSat (UKSA), StraND (UK, SSTL) : Use of SM&C Services Presentation • Reusing Component Infrastructures for MO Services Presentation • XTCE status Discussion • Call for interest: MPS Services Discussion • Liaison with NAV, Security and SOIS • RAC WG (not physically meeting, only via telecons) • GB outline and contents Discussion • Telerobotics BOF • Concept Paper Discussion • Charter Discussion • All WGs: Review of Charters, 5 Year Roadmap, Long Term Strategy NESTOR: Update

  12. CSS Meeting Objectives Cross Support Architecture WG Architecture Book Concept (Green Book) Review; plan for completion Architecture Book (Magenta Book) Review; plan for completion Cross Support Transfer Services WG Cross Support Transfer Service (CSTS) Framework Complete Forward Services Framework (Return services completed) Monitored Data Service Update re latest Framework Tracking Data Service Update re latest Framework CSTS Guidelines and Concept Books Update re latest Framework Framework and Monitoring Service Prototypes Discussion, Interoperation Planning “Generic” File Transfer Discuss, identify the use cases Cross Support Service Management WG Agency Inputs Review; derive aggregate priorities Concept Framework, Formal Model Review, adjust, agree Standardization Plan Synthesize re priorities, framework CSS (Area Level) Inter-area: SM, MOIMS NAVWG Discuss Event Messages vs. TTC Planning (Tentative) Inter-area CSA, SIS DTN Coordinate cross support architecture and DTN ERIC: Update

  13. SLS Meeting Objectives: 1/2 • Space Link Code/Sync WG • 131.3-B DVB-S2 TM Coding Streamlined - Red-1 Agency Review to start ASAP • 130.1-G TM Coding Green Issue 2 to be finalized at this meeting • Two Orange Books Long Erasure Codes (DLR) + Short LDPC uplink Codes (NASA) • 211.2-B Proximity-1 Coding Agency Review (5-years + LDPCC) in progress • 230.1-G TC Coding Green-2 To undergo Poll for Publication • Published Blue Book: 131.2-B (shortly) SCCC TM Coding • MHDC WG • Lossy Compression • Review compression performance results for candidate lossy compression algorithms • Select a single lossy compression algorithm for standardization • Review material submitted for lossless Green Book • 123.0-B Lossless Multispectral & Hyperspectral Image Compression (Red Book) and updated 121.0-B Lossless Data Compression To undergo Poll for Publication Space Link Protocols WG • Proximity-1 Green Book Identify changes due to BB review • AOS and TM protocols BBs Evaluation of 5-year review • Proximity-2 protocol Presentation of new proposal • Proximity-1 Data Link BB Agency Review (5-years + LDPCC) in progress • Next Generation Uplink WG • NGU Green Book Draft-2Review • NASA White Paper New options for the CCSDS Telecommand Standard • Joint NGU/C&S Future Uplink Codes: non-binary LDPC (NASA) + Turbo (DLR) GIPPO: Update

  14. SLS Meeting Objectives: 2/2 • RF & Modulation WG • 401.0-B RF & Modulation: • Modulation for 2 GHz Earth relays: Green Book drafting (continuing) • Modulation for high rate TM & PN ranging: Independent studies review (continuing) • -Modulation for 26 GHz Space Research Service (SRS) downlinks: Pink Sheets/Book drafting • -Modulation for 32 GHz downlinks:  Pink Sheets/Book drafting • -NGU driven requirements: initial discussion • Space Data Link Security WG • SDLS Core Protocol • Blue Book Disposition of Red-2 Agency Review RIDs – Finalization of document • Yellow Book Interoperability testing progress reports and discussion of test plan • Green Book Finalization of a complete draft-1 version • SDLS Extended Protocol URD discussion, proposed solutions : review of inputs • Planetary Communications SIG • Status of Agencies plans Review • Technical Options Review, technical trade-offs, discussion • Status of studies for lunar and Mars missions Report • Overview of technologies and techniques for lunar/Mars proximity links • Next steps • Optical Communications SIG (DID NOT MEET IN BOULDER) • Report on IOAG/OLSG activities • Finalize concept paper on Space Optical Communications • Discuss link-budget conventions • Update agencies plans • Workshop: Trends in optical space communications. GIPPO: Update

  15. SIS Meeting Objectives • Motion Imagery & Applications WG • Review all changes as a result of CESG review of the Red Draft. • Review and finalize the Interoperability Test Plan. • Reach consensus on possible future work (books) for the MIA WG. • Delay Tolerant Networking WG – Tues PM, Wed AM&PM • Solar System Internet Architecture Document (Green Book) Review draft and SISG comments • BP for CCSDS Review Review Finalized Post-Red-2 Book • BP Interoperability Test Plan Finalize test plan / schedule • CFDP Pink Sheet Discussion Discuss CFDP augmentations for better efficiency in internetworked environments • DTN Interoperability Testing, Thu AM • Review on-going experimentation and operations • Discuss interoperability and/or testing opportunities on ISS • Discuss how ISS can serve as a DTN-concept and Bundle Protocol testbed (e.g. ESA, JAXA DTN on ISS) • Voice WG – Wed AM&PM, Thurs AM&PM – Titanium 2.04 • Discuss and disposition proposed changes to Magenta Book • Sections 1—3 • Is Annex C (Lip Synchronization public affairs) really needed? • SIS Plenary – Thurs PM • Review WG progress • Identify issues/topics for CESG/CMC action • CFDP-over-Encapsulation – no formal meetings • Draft book for CFDP-over-Encapsulation in queue for review; see Keith Scott / Chris Taylor / Dai Stanton with questions

  16. SOIS Meeting Objectives • Application Support Services WG • Green Book V2 Publish • Device Virtualisation Service1st Agency Review • Device Enumeration Service1stAgency Review • Architectural issues Discussion • Remote Interface Units • Polled MIL-STD-1553B data acquisitions • Result metadata definition • Plug and play aspects Discussion • Finalise use cases • Virtual interfaces and Common Dictionary of Terms (DoT) for sensors and actuators • Common DoT structure, contents, tooling • Use of Electronic Data Sheets (EDS) for device specification • SOIS EDS XML Schemas and example device datasheets • Wireless WG • Not meeting due to NASA travel restrictions • Ad-hoc teleconferences will be organised to close Green Book Update project • Subnetwork WG • Not active • Cross Area • SEA XSG SIG/SOIS-APP – XML Schema alignmentDiscussion

  17. Have a great meeting week! 08:30 18:30 ?