An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Industrial Commercial Brownfield Remediation Prepared for: Vigo County/Terre Haute Department of Redevelopment

  2. Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer

  3. Project Location 13th and Hulman Streets Terre Haute, IN

  4. History of Property • Opened in 1916 as Indiana Coke and Gas Company • Closed in 1988 • Known contaminants include: benzene, toluene, ethylbenzene, xylene, and polyaromatic hydrocarbons January 1940

  5. Design Requirements • Brownfield considerations • Environmental remediation • Commercial and industrial use • Hulman and 13th Street improvements • Railroad access to site • Location of detention pond

  6. Site Map

  7. Progress to Date • Development Envelope • Topographic Survey • Low Impact Development (LID) • Codes and Regulations • Subsurface Conditions • Begin Phase II Review Int. of 13th Street and Lockport Road September 2004

  8. Development Envelope • Availability and location of utilities • Floodplains, wetlands and underground mines • Right-of-way • Zoning restrictions • Soil contamination Holey Moley 800-382-5544

  9. Topographic Survey • Rough topographic survey completed • Obtained complete survey performed by American Consulting Inc. • Compared two surveys to ensure accuracy

  10. Topographic Survey

  11. Low Impact Development • Bioretention considerations • Vegetated swales • Pervious pavements • Cisterns • Cost analysis

  12. Codes & Regulations • Risk Integrated System of Closure (RISC) document • Federal contamination guidelines for ground water • Design Standards and Specifications Terre Haute and Indiana Department of Transportation

  13. Subsurface Conditions • Preliminary geological investigation • Compared with soil borings from Trinity Environmental Group and ATC investigations • Limitations for development Intersection of 13th and Hulman Streets September 2004

  14. Future Direction • Finish Phase II review & GIS mapping • IDEM response letter & proposed additional testing • Remediation plans • Potential development scenarios

  15. Phase II Review & GIS Mapping • Soil borings and analytical testing • Location of contaminants • Contamination density mapping (GIS) • Brownfield research • Federal, state, and local development requirements • Grant availability

  16. IDEM Response Letter & Proposed Additional Testing • Inadequacies of initial testing • What tests need to be conducted again? • What tests have never completed that are needed? • How much extra will this cost?

  17. Remediation Plans • Specific areas or entire site • Closure levels • Worst-case scenario • Plan based on current contaminant knowledge • Cost analysis of two options

  18. Phase II Potential Development Scenarios • Site layout • Phasing of project • Roadway design Phase I Phase III Phase IV

  19. Timeline

  20. Questions?