110 likes | 300 Views
Arctic2007. NASA FR: 7P001 NASA Goddard Space Flight Center Wallops Flight Facility Principal Investigator: Dr. Ken Jezek; OSU Byrd Polar Research Center Mission Manager: John Valliant CSC – NASA WFF Code 840. Potential Co-Principal Investigators.
E N D
Arctic2007 NASA FR: 7P001 NASA Goddard Space Flight CenterWallops Flight Facility Principal Investigator: Dr. Ken Jezek; OSU Byrd Polar Research Center Mission Manager: John Valliant CSC – NASA WFF Code 840
Potential Co-Principal Investigators • Dr. Prasad Gogineni - gogineni@ittc.ku.edu • Mr. William Krabill – William.B.Krabill@nasa.gov • Dr. Keith Raney - Keith.Raney@jhuapl.edu • GSFC Greenbelt • Others?? Arctic20070 TIM 10/10/2007
Documentation Requirements • Flight Requests – OSU and WFF in; others ?? (JHU… suborbital.nasa.gov) • Danish/Canadian Over-flight Clearances • General Experiment Information and Request Worksheet (PIs) • Project Plan (840) • Mission Operations Safety Directive (840) • ECF MOSD (548) • Approval to Proceed (800/840) Arctic20070 TIM 10/10/2007
Reviews / Meetings • Airworthiness Review Board (840/548) • Mission Readiness Review (840) • Final Installation Inspection Review (840/548) – Subsequent Safety of Flight Release • Weekly/Monthly Technical Flight telecons Arctic20070 TIM 10/10/2007
Preliminary Mission Timeline • ARB Review January 16, 2007 • Receive instrumentation March 6, 2007 • Begin upload March 13, 2006 • Complete upload April 13, 2007 • Final Installation and Inspection Review April 16, 2007 • Safety of flight Release April 17, 2007 • Mission Readiness Review April 18, 2007 • Engineering Check Flight April 19, 2007 • Begin Mission April 23, 2007 • Return to WFF on May 14, 2007 • Question; Test flight requests Arctic20070 TIM 10/10/2007
Arctic2007 Basing Options • Thule AFB • Kangerlussuaq (Sondrestrom) • Canada ?? • Iceland ?? Arctic20070 TIM 10/10/2007
Mission Costs • P-3 Subsidized rate at $ 2,500/hr • Transit time ~ 16 hrs round trip • ECF ~ 1-3 hrs • Test Flights ?? • ~ $ 50K non-science hours (ECF, transit) • + MPCs Arctic20070 TIM 10/10/2007
Mission Peculiar Costs • Aircrew Per-Diem (Lodging/M&IE) • Airfield Costs • Deicing • Ramp charges • Administrative Fees • Crew Overtime • Fuel Exceeding Subsidized rate $ 3.00 • Shop Supplies • Engineering/Fabrication Arctic20070 TIM 10/10/2007
Estimated Basing Costs (MPCs) • Assumptions; • 7 air-crew members • 15 hours overtime/day • Thule (per week) • Aircrew Per-Diem (Lodging/M&IE) = $ 64/day = ~ $ 3K • Airfield Costs = $ 0 • Deicing • Ramp charges • Administrative Fees • Crew Overtime = $ 5K • Fuel Exceeding Subsidized rate of $ 3.00 = $0 • WAG for Thule = 8K/week Arctic20070 TIM 10/10/2007
Estimated Basing Costs (MPCs) • Assumptions; • 7 air-crew members • 15 hours overtime/day • Sonde (per week) • Aircrew Per-Diem (Lodging/M&IE) = $ 313/day = ~ $ 15K • Airfield Costs = $ 1700/day = ~$ 12K • Deicing ( not included) • Ramp charges • Administrative Fees • Crew Overtime = $ 5K • Fuel Exceeding Subsidized rate of $ 3.00 (fuel rate $3.70-$4.50) = $4K / day = ~$ 28K • WAG for Sonde = $ 60K/week Arctic20070 TIM 10/10/2007
Cost ?? • Assumption; 40 flight hours/week • 300K + 50K non-science = $350K • 2 weeks Thule = $ 20 K • 1 week Sonde = $ 60 K • Total scenario cost ~ $ 430K Arctic20070 TIM 10/10/2007