1 / 1

Equipment Scheduling and Optimization Project # OSU 05-HLBT

Equipment Scheduling and Optimization Project # OSU 05-HLBT. Project Team Principal Investigator Ricki G. Ingalls, Ph.D. Co-Principal Investigator Carlos Oliveira, Ph.D. Graduate Assistant Ananth Krishnamoorthy Graduate Assistant Rajesh Velliyanallore. Project Motivation

bian
Download Presentation

Equipment Scheduling and Optimization Project # OSU 05-HLBT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Equipment Scheduling and Optimization Project # OSU 05-HLBT Project Team Principal Investigator Ricki G. Ingalls, Ph.D. Co-Principal Investigator Carlos Oliveira, Ph.D. Graduate Assistant Ananth Krishnamoorthy Graduate Assistant Rajesh Velliyanallore Project Motivation • Halliburton • One of the world's largest providers of products and services to the oil and gas industries. • Production Enhancement Services Division • Improves yield from existing well • Fracturing, acidizing, coiled tubing, hydraulic workover, sand control, and pipeline and process services • Challenge • Continuous Move • Eliminate Dedication to camp • Redundancy Requirements Project Objectives • Increase Asset utilization and efficiency • Develop a financial plan to justify coalescing equipment across camps • Develop a scheduling system to permit continuous moves Project Activities • Documenting business requirements • Problem formulation Research Methodology Solution • Mixed Integer Programming • Heuristics / Lagrangian techniques under evaluation • Decomposition Components of this Project • Financial Justification Through Historical Look Back • Use 9 Months of Historical Data • Develop a proposal based on “future scenario” • Scheduling • Permit borrowing of equipment from “outside” • Remove fleet dedication constraints • Continuous Moves • Provide for redundancy – Failure redundancy, Flow Redundancy

More Related