150 likes | 268 Views
Working Group for Consolidated Communications Management (JAG-CCM) Update Spring CSAB 2008. Mr. Charles Abel AFWA JAG Representative. OVERVIEW. MEMBERSHIP ACTION ITEM STATUS UPDATE ESTIMATES AND PROJECTIONS ISSUES. MEMBERSHIP. Walter Coley (AFWA) – Chairman Charles Abel (AFWA) – T
E N D
Working Group for Consolidated Communications Management (JAG-CCM) UpdateSpring CSAB 2008 Mr. Charles Abel AFWA JAG Representative
OVERVIEW • MEMBERSHIP • ACTION ITEM STATUS UPDATE • ESTIMATES AND PROJECTIONS • ISSUES
MEMBERSHIP Walter Coley (AFWA) – Chairman Charles Abel (AFWA) – T Daniel Starosta (NWS) – T Barbara Tobe (NWS) Sheryl Panek (FNMOC) Jerry Core (NAVO) Seyed Hosseini (NESDIS) Bill Godfrey (NESDIS) – T Ben Kyger (NCEP) Luis Cano (NCEP) – T T=Tech support
ACTION ITEM UPDATE • COPC AI • 2007-2.16 NWS Port 20 and 21 convert costs • CSAB AI • 2007-2.4 DATMS-U Backup Procedures • 2007-10.1 Communication Use Estimates
COPC Action Item 2007-2.16 • NWS cost and Schedule to convert to SFTP • NWSTG – None; already converted • NESDIS – Communicates through NWSTG • SFTP capability - $140K and 4 months • NCEP • Official Communication through NWSTG • HTTPS, SSH, VPN are available • Recommendation – Convert NESDIS to SFTP
Action Item 2007-2.4 • Documented Backup Procedures • DATMS-U Is The Most Reliable Link ~99.99+% • All Sites Can Use Internet For Short Term Backup • Capacity has expanded • May provide viable backup • Current Documented Backup Procedures Outdated • Based on Old data and results • Recommend semi-annual Backup testing • Create repeatable backup procedures • Eliminate bottlenecks
Action Item 2007-10.1 • Communications Bandwidth • Communications projections recalculated • Community activity still a work in progress • Consistent method to track bandwidth being tested • Interpretation must be consistent • Builds better ‘Big Picture • Site and Systems Accreditation are concerns for security and data throughput
Issues • Interagency Modeling CONOPS • Under review by JAG/OCM for potential file sizes needed for projections • Initial look • If GRIB 2 used • Bandwidth increase may be within projections • If GRIB 1 used • Initial projection is 3 to 10X current bandwidth • More data exchange will highlight bottlenecks • Increased use will accelerate DoD network changes
Issues • Meeting Friday with JAG/DISA/NWS 18 April • Discussed future of DATMS-U • Short and long term solutions • Diverse connections between DoD and NWS clouds • Action Items • On Scope Of All Team Members • Monthly teleconferences • Working relationships at TOC, Navy and AF excellent • “Spot” teleconferences key to information exchange • Information Assurance now engaged