An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Working Group for Consolidated Communications Management (JAG-CCM) UpdateSpring CSAB 2008 Mr. Charles Abel AFWA JAG Representative

  2. OVERVIEW • MEMBERSHIP • ACTION ITEM STATUS UPDATE • ESTIMATES AND PROJECTIONS • ISSUES

  3. MEMBERSHIP Walter Coley (AFWA) – Chairman Charles Abel (AFWA) – T Daniel Starosta (NWS) – T Barbara Tobe (NWS) Sheryl Panek (FNMOC) Jerry Core (NAVO) Seyed Hosseini (NESDIS) Bill Godfrey (NESDIS) – T Ben Kyger (NCEP) Luis Cano (NCEP) – T T=Tech support

  4. ACTION ITEM UPDATE • COPC AI • 2007-2.16 NWS Port 20 and 21 convert costs • CSAB AI • 2007-2.4 DATMS-U Backup Procedures • 2007-10.1 Communication Use Estimates

  5. COPC Action Item 2007-2.16 • NWS cost and Schedule to convert to SFTP • NWSTG – None; already converted • NESDIS – Communicates through NWSTG • SFTP capability - $140K and 4 months • NCEP • Official Communication through NWSTG • HTTPS, SSH, VPN are available • Recommendation – Convert NESDIS to SFTP

  6. Action Item 2007-2.4 • Documented Backup Procedures • DATMS-U Is The Most Reliable Link ~99.99+% • All Sites Can Use Internet For Short Term Backup • Capacity has expanded • May provide viable backup • Current Documented Backup Procedures Outdated • Based on Old data and results • Recommend semi-annual Backup testing • Create repeatable backup procedures • Eliminate bottlenecks

  7. Action Item 2007-10.1 • Communications Bandwidth • Communications projections recalculated • Community activity still a work in progress • Consistent method to track bandwidth being tested • Interpretation must be consistent • Builds better ‘Big Picture • Site and Systems Accreditation are concerns for security and data throughput

  8. Current –Spring 2008

  9. Current Data Exchange

  10. Current Data Exchange (cont)

  11. Current Data Exchange (cont)

  12. Current Data Exchange (cont)

  13. DATMS-U Changes –Spring 2008

  14. Issues • Interagency Modeling CONOPS • Under review by JAG/OCM for potential file sizes needed for projections • Initial look • If GRIB 2 used • Bandwidth increase may be within projections • If GRIB 1 used • Initial projection is 3 to 10X current bandwidth • More data exchange will highlight bottlenecks • Increased use will accelerate DoD network changes

  15. Issues • Meeting Friday with JAG/DISA/NWS 18 April • Discussed future of DATMS-U • Short and long term solutions • Diverse connections between DoD and NWS clouds • Action Items • On Scope Of All Team Members • Monthly teleconferences • Working relationships at TOC, Navy and AF excellent • “Spot” teleconferences key to information exchange • Information Assurance now engaged