Capstone Project GI Analysis

Capstone Project GI Analysis. C Team. Conservation Fund Historic Districts NOAA NCDNR Larger Watershed Partners US Forest Service Land Acquisition Groups Forest Industries Agriculture Groups HOAs Fish and Wildlife Universities. Leadership Forum. Local/State GIS planners

bina
Download Presentation

Capstone Project GI Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capstone ProjectGI Analysis C Team

  2. Conservation Fund Historic Districts NOAA NCDNR Larger Watershed Partners US Forest Service Land Acquisition Groups Forest Industries Agriculture Groups HOAs Fish and WildlifeUniversities Leadership Forum Local/State GIS planners Planning/Zoning Utilities Citizen Groups USACoE Local Developers Parks & Recreation Dept. DoT County Commissioners Local Elected EPA

  3. GI Design Objectives • Identify existing high priority wetland areas • Include RTE species, flood areas, pristine areas • Allow for continued economic and general growth in the county • Must be able to be integrated into County Master Plan • Protect existing wetlands through acquisition or easment over time • Include public education and ecotourism goals into rollout to get buy-in • Overlay RTE habitat with wetlands to target species-based protection Beaufort-NC.org

  4. Data Analysis Examined metadata for creation dates, spatial extents, temporal information, accuracy, overall functionality, and potential use conflicts. Excluded data that did not have associated metadata or dates. If data was repeated in multiple layers, the data that included more detailed county information was chosen.

  5. Data Analysis Data Excluded from original dataset: • NC_MajorHydro • NC_WaterBodies • WetlandRestEnhOpp • WRP_TargetedWatersheds Data to be added: • Floodplain (not acquired) • RTE species (extrapolated from WetlandsRating layer) • Land use (used parcel and NC_Cities information) • Impervious surface (not acquired) • Hazards data (not acquired) Beaufort-NC.org

  6. Acreage of high priority wetlands Conversion of Features to Raster format Calculated Euclidean Distance on streams and roads Reclassified often SingleMapAlgebra to eliminate areas from wetlands database that had habitat disruption Calculated acreage from entire wetlands dataset Selected anything greater than 2 acres Chose 13,643 acres out of 229,942

  7. Development of Wetlands Protection Overlay Zone • Selected parcels that were either classified as private or City/County ownership • Created a 4km buffer around existing developed cities • Using SingleMapAlgebra identified wetland areas that overlapped with these areas and removed them from the protection zone • Focus future development in this area to avoid disruption to existing wetland systems

  8. Land parcels most important to county’s wetland protection • Created a 5km buffer around the fisheries nursery areas. • Selected wetlands that were within conservation lands, natural heritage areas, fisheries buffer and high rankings of: overall, habitat, and replacement value. • Any wetlands that fell within these areas were classified as “Most important to County’s wetland”