An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Report on Electric RFP • Merger of Columbus Southern Power and Ohio Power under the name of Ohio Power • Different Fuel Rates • Columbus Southern Division • Ohio Power Division • Distribution Costs set through May 2015 • Capacity Costs change June 2014, June 2015 and June 2016

  2. Contract Status • Ohio School Consortium Program • Current Contract - $.055 kWh for generation • Contract expires December 2013 billing cycle • Monthly roll over with price adjustment on 30 day notice • Strategic \ Direct Energy Program • Rates differ by Ohio Power class – target set method • Current Contract expires May 2014 billing cycle • Standard Service Offer – ranges by class $.07 to $.10

  3. Expected Future Electric Prices • Distribution – Increase in the Distribution Riders • Significant Increase in the PJM capacity cost for PJM year 2014, 2015 and a decrease 2016 • Energy cost stable – unless there is a run up in natural gas prices

  4. Joint MEC Public Bid • September RFP • Uniform Contract based on the current agreement • Requested quotes for PJM year 2014, 2015 and 2016Bids due in Nov 1st • Award Bids on Nov. 4th • Sign Up between Nov. 4th and Nov. 6th

  5. Second Start Date • First Start Date for the RFP is January billing cycle 2014 • Covers Schools now in the MEC program • Covers Schools now on Ohio Power Standard Service • Second Start Date May billing cycle 2014 • Covers those in the Strategic \ Direct Program

  6. Check List to Participate in RFP • Review the Proposed Contract • Secure Board or Management Approval to accept the bid offer- If attractive • Review the final bid offer • Execute the uniform contract between Nov 4th and Nov. 6th -- If attractive