Mumbai agenda 1 • 09:00Welcome M. Barma, Director, TIFR • 09:15Orientation and announcements N. Mondal • 09:25Introduction and aims of the meeting(ppt) K. Long • 09:40PPEG: review of progress, issues to be addressed (pdf) P. Huber • 10:05Accelerator w/g: review of progress, issues to be addressed (pdf) C. Prior • 10:30Detector w/g: review of progress, issues to be addressed (ppt) P. Soler • 11:30Review of physics performance (pdf) T. Li • 12:00Review of technical specification (c.f. baseline) (ppt) A. Bross • 12:30Discussion All
Mumbai agenda 2 • 14:00Overview of current status of IDS-NF and EUROnu accelerator study (pdf) J. Pozimski • 14:30Overview/modelling the muon front-end (pdf) C. Rogers • 15:00IDS-NF convergence issues; discussion (ppt) All • 16:00Proton-driver activities (ppt) J. Pasternak • 16:30Developing ISIS into a proton driver for the Neutrino Factory (ppt) C. Prior • 16:55Powder target studies (Upload new attachment "S2-Densham-1-v1.ppt") C. Densham • 17:20Progress on solid target studies (Upload new attachment "S2-Edgecock-1-v1.ppt") K. Long for E. Edgecock • 17:45Discussion (Upload new attachment "S2-Discussion-1-v1.ppt") All
Mumbai Agenda 3 • 09:00Near detector and systematics (ppt) W. Winter • 09:25Status of the near detector (ppt) R. Tsenov • 09:50Decay ring and beam diagnostics (ppt) M. Apollonio • 10:15Decay ring designs and modelling (pdf) C. Prior • 10:40Discussion All • 11:30News from MICE (ppt) K.Long or M.Apollonio • 12:00Status of MuCOOL (ppt) A. Kurup • 12:30Yield simulations and a low frequency study C. Rogers for G. Prior • 12:40Discussion All • 14:00Progress on muon linac and RLAs (ppt) A. Bogacz • 14:40Particle tracking for the muon linac (pdf) C. Bontoiu • 15:00Progress and status in FFAG design (ppt) J. Pasternak
Mumbai agenda 4 • 16:00Beam loading in the muon accelerator (pdf) J. Pozimski • 16:10Status of preparations for start-to-end simulations (pdf) C. Rogers • 16:40Discussion (Upload new attachment "S6-Discussion-1-v1.ppt") All • ======= • 09:00Physics motivation for cLFV (ppt) A. de Gouvea • 09:30Muon to electron conversion experiments (pdf) Y. Uchida • 09:55High intensity muon source and muon beamline (ppt) A. Kurup • 10:20Next-generation experiment, PRISM (ppt) J. Pasternak • 10:45Synergy between cLFV and Neutrino Factory (ppt) Y. Kuno
Mumbai Agenda 5 • 11:30Silver channel at intermediate baseline (pdf) W. Winter • 11:50Near detector (ppt) P. Soler • 12:10100 kTon MIND at intermediate baseline (pdf) A. Blondel (phone) • 12:30Low energy Neutrino Factory (ppt) A. Bross • 12:50200 microsec bunch spacing in proton driver (pdf) S. Berg • 14:00PPEG plans for convergence on content of IDR (ppt) W. Winter • 14:15Accelerator w/g plans for convergence on content of IDR (pdf) J. Pozimski • 14:30Detector w/g plans for convergence on content of IDR (ppt) P. Soler • 14:45Discussion All
summary • While the total attendance was not great (~60 in total, ~ 15 in accelerator sessions) the presentations and discussions have been very good and fruitful. • Need to achieve convergence until interims design report
The path to the IDR • Produce a to-do list for each section of the accelerator chain • - What needs to be done until the “freeze” (definition) of design at the IDS-NF plenary meeting in April 2010 • - What are the required steps to be performed after the freeze to prepare the IDR • Define an agreed list of criteria for the decision making process • - List of criteria should be finished by end of • 2009 to start “selection” process early 2010.
Proton driver • Problem : IDS & EURO-WP3 do not cover the proton driver but are relying on a certain parameter set on target. • Update & prioritize proton driver parameter list (December ’09). • Continue discussion with potentially interested hosting labs (until 2012 ?) • Invite presentations on proton driver from labs to April 2010 meeting
Target • LHg baseline • Alternatives under development • Solid • Fluidized powder • Need to evaluate • Baseline & alternatives • How to present work in the IDR • Layout of proton beam dump and splash calculation • Evaluation of safety and radiation issues • Pion production and capture • Yield calculation • Pion Capture (B field - together with muon front end) • Engineering design of capture magnet • Engineering design of Nozzle & mercury handling
Muon front end • Pion production and capture (October’10). • Yield calculation • Pion Capture (B field - togetehr with target) • phase rotation (December’09 ?). • shorter bunch length option • Cooling and Phasen rotation (February’10 ?). • low RF level option • reduced B-field option • surface preparation option • high pressure gas filled cavities • In person meeting planned for mid November 2009 at RAL (just before the target meeting, but may be delayed by one month and moved to BNL)
Linac & RLA • Field optimisation (solenoid & cavity) (November’09). • Particle tracking in LINAC based on Field maps (December’09) • Optimisation of interface RLA1-RLA2 for LENF option (December’09) • Field optimisation (DP & QP & SP ) (Feb ’10). • Particle tracking in RLA1 (March’10) • Benchmarking codes (April ’10). • Update of baseline and lattice freeze (IDS meeting at Fermilab, April’10). • Particle tracking in RLA2 (June ’10). • Conclusions and preliminary cost estimates (at the time of the IDR).
FFAG • Optimisation and update of injection/extraction (December’09). • Injection/extraction in the Nonlinear NS FFAG (December’09). • More tracking studies with errors in the preselected lattices (February’10). • Parallel work on alternative solutions (March’10). • More studies on feasibility of hardware for injection/extraction (March’10). • Update of baseline and lattice freeze out (IDS meeting at Fermilab, April’10). • Preliminary magnet design (June’10). • Tracking studies with errors in realistic field maps (Nufact’10 – October). • Conclusions and preliminary cost estimates (at the time of the IDR).
Decay rings • Compact decay ring design (25 GeV) (December’09). • LENF decay ring design (February ’10) • Studies of RF requirements as function of energy spread and ring design (if both straights are used (February’10) • Beam instrumentation studies • Energy monitor (March’10) • Divergence (May ’10) • Flux (July ‘10) • Preliminary magnet design (June’10) • Tracking studies with errors in realistic field maps (Nufact’10 – August) • Conclusions and preliminary cost estimates (at the time of the IDR)
Further requirements ? • Subtask coordinator should organize meetings (telephone / in person) to - produce criteria list - to organize the subtasks (who is doing what ?) - ensure that convergence goal is reached until April 2010 - All must be aware - mailing list & IDS web page • Subtask coordinator should organize meeting to prepare a consistent parameter list (early 2010) • Organized (additional) engineering support - Starting early 2010 to have first designs available in autumn 2010 to enable first costing starting in autumn. • Attract experts in project costing to help with the IDR
Update milestones table • We (UKNF) need to update the milestones table and add finer granularity to the years • 2010 (in accordance with convergence) • 2011 & 2012 • I sent around the old milestones table please have a look at them and sent me back the update table as soon as possible if you haven’t already done so