An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Nearby Supernovae Factory:Monitoring Spectrograph Calibration Lamp Ben Dilday Advisor: Rick Kessler, CfCP Physics 335 March 10, 2004

  2. Project Overview • SNFactory • Observe low-Z Type Ia supernovae • Correlate intrinsic brightness with light curve characteristics • Reduce statistical error in cosmological parameters

  3. Project Overview • Calibration • Blackbody emission source (lamp at T~3000K) calibrates spectrograph • University of Chicago CfCP Role • instrumentation to confirm stability of blackbody source • Measure red-blue ratio

  4. Physics 335 Project Objectives • Hardware • Construct casing for pin diodes • Remotely controlled roof • Opens to allow light onto PIN diodes • Closes to protect from environment • Instrument installation • Software • Stepper motor (roof) interface • Analysis

  5. Physics 335 Objectives • Casing for pin diodes COMPLETED 16 1/2” x 15 1/2” x 10 1/4” 1/4” garolite on 1/2” aluminum base 1/32” garolite roof on 1/8” garolite frame

  6. Physics 335 Objectives • Remotely controlled roof • 1.8 degree stepper motor • - interfaced via AllMotion EZHR23 stepper motor controller • Previous controller: EZ17 • - coarse step resolution • inadequate

  7. Physics 335 Objectives • Stepper motor (roof) interface COMPLETED Allows remote operation and status checks

  8. Physics 335 Objectives • Instrument Installation INSTALLATION SCHEDULE March 22nd – Hilo Reassemble instrument March 29th – Mauna Kea Install on UH 2.2 meter Mauna Kea Observatories, Hawaii http://www.ifa.hawaii.edu/mko/maunakea.htm

  9. Physics 335 Objectives • Analysis of PIN diode data SOFTWARE In progress SN OBSERVATIONS ~Late Spring ? Gemini, the UH88 inch and UKIRT http://harris.roe.ac.uk/~jkd/startrails.html

  10. Conclusion & Project Outlook • Casing with Roof • COMPLETE • Stepper motor (Remote Operation) • COMPLETE • Installation • Scheduled for end of March • Analysis • PIN diode analysis software likely finished by late April • Application of PIN diode data • Techniques not certain until experiments can be carried out