510 likes | 760 Views
ERP. ENTERPRISE RESOURCE PLANNING. ERP REVIEW Connectivity to ERP Server at Hyderabad. ERP REVIEW ERP CONNECTIVITY : VPN OVER BROADBAND. ERP REVIEW GMM wise ERP Connectivity Status. ERP REVIEW GMM wise ERP Connectivity Status. ERP REVIEW GMM wise ERP Connectivity Status.
E N D
ERP ENTERPRISE RESOURCE PLANNING
ERP REVIEW Connectivity to ERP Server at Hyderabad
ERP REVIEW ERP CONNECTIVITY : VPN OVER BROADBAND
ERP REVIEW GMM wise ERP Connectivity Status
ERP REVIEW GMM wise ERP Connectivity Status
ERP REVIEW GMM wise ERP Connectivity Status
ERP REVIEW GMM wise ERP Connectivity Status
ERP REVIEW GMM wise ERP Connectivity Status
ERP REVIEW GMM wise ERP Connectivity Status
ERP REVIEW GMM wise ERP Connectivity Status
ERP REVIEW GMM wise ERP Connectivity Status
SSA - KALYAN CSR Network E1 NIB II Cloud Pune CR Kalyan FE STM1 Talasari1 CDOT Aggregation router Dahanu1 CDOT Kalyan1-CDot Central router FE Kalyan1- E10B Palghar1 CDOT Kalyan1-TAX OCB Tarapur1 OCB Bhiwandi1-AXE Mokhada1 CDOT Kalyan1-OCB Kalyan1- Tandem OCB Jawhar1 CDOT Bhiwandi1-OCB Local Ulhasnagar1-E-10B BadalapurEast1 EWSD Dombivelli1 C-DOT VasaiRoad 1 OCB Shahapur1-C-DOT Wada1 CDOT Murbad CDOT Dombivelli1-OCB-Local Bhiwandi1 CDOT Ulhasnagar1-Fetex Dombivelli1-EWSD Ulhasnagar-OCB Vasai Papdi1 OCB Ulhasnagar2-OCB
CSR Network E1 SSA - AHMEDABAD Existing router VADODARA NIB II Cloud AHMEDABAD Sanand CDot MAX-L FE Aggregation Router at Bhadra NIB FE 4 E1 32 E1s STM 1 Navrangpura OCB Dhandhuka CDot MAX-L ViramgamCDot MAX-L STM-1 Central Router at GBT (32 addl. E1s) Barwala CDot MAX-XL Navrangpura EWSD Dholka CDot MAX-L Bhadra 5ESS Bapunagar 5ESS Jamalpur EWSD Vasna EWSD OCB Vasna E-10B EWSD Railwaypura LG-WLL BSC-0 Bhadra TAX EWSD LG-WLL BSC-1 Gulbai Tekra TAX OCB ZTE-WLL Naranpura 5ESS Naranpura E10B Gulbai Tekra EWSD Gulbai Tekra TAX AXE-10 Dehgam CDOT MAX-XL Gandhinagar 5 ESS Gandhinagar E10B Gandhinagar OCB STM1 FE
SSA - BHOPAL E1 CSR Network BHOPAL NIB IICloud INDORE FE STM1 FE/E3 FE Aggregation Router Central Router ATX EWSD RS Nagar EWSD ATX OCB TAX I CTX OCB CTX TAX II ATX ZTE WLL-MSC City E10B Obedullagan CDOT Berasia CDOT Govindpura C-DOT STM1 Budhni CDOT Ashta CDOT Sehore CDOT FE
PE Router (Cisco 7613) PE Router (Cisco 7613) SSA(1) – Site 1 SSA(2) – Site 1 SSA(2) – Site 3 SSA(1) – Site 3 SSA(1) – Site 2 SSA(2) – Site 2 SSA (2) Network – ERP Users SSA (1) Network – ERP Users Proposed ERP User Access Connectivity to CDR MPLS for Circle Offices Remote Router NIB-2 MPLS VPN Network STM-1/FE STM-1/FE Aggregation Router (Cisco 7609) Aggregation Router (Cisco 7609) Aggregation Router (Cisco 7609) Aggregation Router (Cisco 7609) Aggregation Router (Cisco 7609) Aggregation Router (Cisco 7609) CDR Aggregation Network
ERP REVIEW GMM wise Status of Filled-up Templates
ERP REVIEW GMM wise Status of Filled-up Templates
ERP REVIEW GMM wise Status of Filled-up Templates
ERP REVIEW GMM wise Status of Filled-up Templates
ERP REVIEW GMM wise Status of SAP CLIENT in PCs
ERP REVIEW GMM wise Status of SAP CLIENT in PCs
ERP REVIEW GMM wise Status of SAP CLIENT in PCs
ERP REVIEW GMM wise Status of SAP CLIENT in PCs
ERP REVIEW GMM wise Status of SAP CLIENT in PCs
ERP REVIEW GMM wise Status of SAP CLIENT in PCs
ERP REVIEW GMM wise Status of SAP CLIENT in PCs
ERP REVIEW GMM wise Status of SAP CLIENT in PCs
FILLING OF PM TEMPLATES IN ERP • DATA TO BE FILLED-UP : • PM ORGANIZATION DATA • WORK CENTRE MASTER DATA • FUNCTIONAL LOCATION MASTER • EQUIPMENT MASTER • EBOM DETAILS • ALL EQUIPMENTS ARE TO BE ENTERED WHICH ARE IN ASSET. • EQUIPMENT ALSO MEANS VEHICLE, CABLE, COMPUTER, ACs etc. • ALL EQUIPMENTS FILLED-UP IN THE PM TEMPLATE MUST HAVE A • CORRESPONDING ASSET_ID OF FICO TEMPLATE • IF ASSET_ID IS NOT AVAILABLE FOR WANT OF ATD, AO MAY CREATE • ASSET FOR 2014-15 WITH ZERO VALUE WITHOUT WAITING FOR ATD.
ACTIVITIES IN PM MODULE • NOTIFICATION : • OSNO : OUTSTANDING NOTIFICATION • NOPR : PENDING NOTIFICATION • NOCO : COMPLETED NOTIFICATION • WORK FLOW : • CREATED BY INITIATOR • ASSIGNED TO VENDOR/MECHANIC/FIELD OFFICER • ACKNOWLEDGED BY CONCERNED PERSON • RE-ASSIGNED TO CONCERNED PERSON • COMPLETED BY THE CONCERNED PERSON • CONFIRMED BY INITIATOR • REWORK REQUIRED BY INITIATOR
ERP REVIEW Finalization of Store Locations • STORE LOCATION AT SDE LEVEL • AT BIG STATIONS, ONE SUB-STORE FOR MUX AND OTHER ONE FOR ROUTE • MAIN STORE UNDER THE CONTROL OF DE • INVENTORY AVAILABLE IN THE STORES TO BE INFORMED TO CONCERNED • AO FOR ACCOUNTING.
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW Common mistakes/errors faced during GO-LIVE
ERP REVIEW GO-LIVE Schedule for WTR
Pre GO-LIVE ACTIVITIES • HCM, FICO, PM AND REM MODULES WILL GO-LIVE IN SEPT-2014 EXCEPT ESS. • SALARY FOR FIRST TIME IN ERP IN LAST WEEK OF SEPT-2014 • ESS WILL GO-LIVE BETWEEN 05-10-2014 TO 10-10-2014 • LEAVE TRANSACTION TO CONTINUE IN HRMS TILL 30-09-2014 • LEAVE BLACKOUT PERIOD FROM 01-10-2014 • LEAVE TAKEN DURING BLACK OUT CAN BE ENTERED IN ERP MANUALLY AFTER GO-LIVE • BLACKOUT FOR GPF/MEDICAL FROM 01-09-2014.
ERP TRAININGS • END USER TRAININGS COMPLETED :