This presentation outlines the original initiatives and accomplishments of the Teterboro Airport Industry Working Group, including the ban on Stage 2 aircraft, nighttime curfew, weight limits, safety improvements, and security upgrades. It also highlights the committee recommendations, infrastructure improvements, and community outreach efforts.

blambrecht
Download Presentation

TETERBORO AIRPORT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TETERBORO AIRPORT INDUSTRY WORKING GROUP PRESENTATION

  2. ORIGINAL INITIATIVES:CHAIRMAN & ELECTED OFFICIALS • BAN STAGE 2 AIRCRAFT • ESTABLISH NIGHTTIME CURFEW • ESTABLISH 80,000 POUND LIMIT • RAISE FLIGHT FEES • REDUCE AIRPORT TRAFFIC BY 10% TO 25 % • SAFETY IMPROVMENTS • SECURITY UPGRADES

  3. INDUSTRY WORKING GROUP: COMMUNITY PLEDGES • VOLUNTARY BAN OF STAGE 2 AIRCRAFT • NEW VOLUNTARY CURFEW HOURS FROM 11PM TO 6 AM. • CONFIRM PPR WEIGHT LIMIT OF 100,000 LBS • UPGRADE SAFETY PROGRAMS • UPGRADE SECURITY PROGRAMS

  4. COMMITTEE RECOMMENDATIONS • WORKING GROUP COMMITTEES DEVELOPED A SUBSET OF APPROXIMATELY 30 RECOMMENDATIONS TO SUPPORT THE COMMUNITY PLEDGES. • SUBCOMMITTEES • NOISE AND EMISSIONS • OPERATIONS • SAFETY AND SECURITY • REGIONAL ADVOCACY

  5. RECOMMENDATIONS • PHYSICAL INFRASTRUCTURE: • NEW FAA TOWER • EXTENSION OF OVERRUN AREAS • INSTALLATION OF BERMS AND PHYSCIAL BARRIERS • ESTABLISH REMOTE VERTIPORT • ENCLOSED ENGINE RUN-UP AREA • INSTALLATION OF VISUAL GLIDESLOPE EQUIP • AIRSPACE/AIRCRAFT APPROACH • CLASS B AIRSPACE • REVISED TEB APPROACHES • ENGINE START UP AND APU POLICY

  6. CONTINUATION • OPERATIONAL RECOMMENDATIONS: • IMMEDIATE VOLUNTARY BAN ON STAGE 2 • LIMIT/PROHIBIT FLIGHT SCHOOLS • NON-ESSENTIAL FLIGHT NIGHT CURFEW • FEES FOR NIGHT TIME OPERATIONS • SAFETY/EDUCATION: • SMS PROGRAM FOR AIRPORT/FBOS/OPERATORS • TEB TRAINING MODULE • CAPTAIN’S CARD • TEB ARR/DPTR COURSE FOR ALL PART 91 OPERATORS

  7. CONTINUATION: • SECURITY: • CRIMINAL BACKGROUND CHECKS FOR NEW HIRES • STANDARDIZE SURVEILLENCE AND REPORTING PROCEDURES FOR ALL FBOs • UNIFORM AIRPORT WIDE PROCEDURES TO PREVENT UNAUHTORIZED ACCESS TO AIRCRAFT • PROHIBIT UNATTENDED, UNLOCKED AIRCRAFT

  8. CONTINUATION: • COMMUNITY OUTREACH: • FORM A UNIFIED MESSAGE • CONDUCT A SURVEY • PRESENTATIONS TO ORGANIZTIONS – CHAMBER OF COMMERCE, NJ INDUSTRY AND BUSINESS ASSOC., ETC. • DEVELOP AN ADVERTIZING/MARKETING CAMPAIGN • QUARTERLY NEWSLETTER • ADOPT A COMMUNITY PROGRAM • DEVELOP WEB SITE

  9. ACCOMPLISHMENTS: • OCTOBER ’06 ROLLOUT/PRESS CONF. • ELECTED OFFICIALS, AIRPORT MANAGEMENT, FBOS, ASSOCIAITONS, OPERATORS PUBLICLY SIGN PLEDGE TO THE COMMUNITIES • TEB BOOTH AT NBAA : 150 ADDITIONAL SIGNATORS • OFFICIAL ANNOUNCMENT OF VOLUNTARY STAGE 2 BAN • OFFICIAL ANNOUNCEMENT OF NIGHTTIME CURFEW FROM 11PM TO 6 AM. • AIRPORT, FBOs AND 135 OPERATORS COMMITTED TO SMS PROGRAMS • PILOT’S HANDBOOK/CAPTAIN’S CARD DISTRIBUTED • TEB BOOTH AT SCHEDULERS/DISPATCHERS CONFERENCE

  10. CONTINUATION: • INFRASTRUCTURE/PHYSICAL IMPROVEMENTS • EMAS – ENGINEERED MATERIAL ARRESTING SYSTEM INSTALLED ON RWY 06 - $8 MILLION (FAA/PA FUNDS) • EMAS – UNDER DESIGN FOR RWY 19 • APPROACH SLOPE INDICATIORS ON RWY 24 AND 19 • RUNWAY END IDENTIFIER LIGHTS ON RWY 1 • BERMS INSTALLED ON NORTHEAST SIDE OF AIRPORT • RESEARCH UNDER WAY ON NOISE ATTENUATED ENGINE RUNUP AREA

  11. CONTINUATION: ENGINEERED MATERIAL ARRESTING SYSTEM

  12. VOLUNTARY STAGE 2 BAN • REDUCTION OF STAGE 2 OPERATIONS LAST QUARTER OF 2005 vs LAST QUARTER OF 2006

  13. REDUCTION OF NIGHTTIME OPERATIONS • NIGHTTIME OPERATIONS FROM 2300 HOURS TO 0600 HOURS LAST QUARTER OF 2005 COMPARED TO LAST QUARTER OF 2006:

  14. PROCEDURES AND SAFETY • SMS PROGRAMS HAVE BEEN INITATED AT TEB WITH ALL FBOs and 135 CHARTER OPERATORS SIGNED UP. AIRPORT OPERATIONS IS WORKING WITH NATA ON AN APPROPRIATE AIRPORT PROGRAM. • TETERBORO AIRPORT QUIET FLYING PROGRAM FOR FIXED WING AIRCRAFT FLIGHT CREW HANDBOOK OVER 3000 DISTRIBUTED AND INTO THE SECOND PRINTING.

  15. COMMUNITY OUTREACH INITIATIVES - 2006 • MONITARY AND OTHER DONATIONS: • FIRE TRUCK TO HASBROUCK HEIGHTS • MONEY FOR MOONACHIE SALT SPEADER • RUTHERFORD EDUCATION FOUNDATION • 15 - $1000 STUDENT SCHOLARSHIPS • SPONCORED SCHOOL “DARE” SOCCER PROGRAM • SPONCERED “OFFICER PHIL” SCHOOL PROGRAM IN MOONACHIE • CONTINUED PAYMENTS TO TOWN OF TETERBORO FOR $6 MILLION WATER PUMP STATION FACILITY • PA BOARD APPROVED $1.75 MILLION FOR MOONACHIE DPW

  16. PUBLIC FUNCTIONS • TWO AIRPORT BLOOD DRIVES • NOISE SYMPOSIUM AND QUIET FLYING AWARDS LUNCHEON • SCHOOL SCHOLARSHIP LUNCHEON • MOTORCYCLE RUN FOR SHELTER OUR SISTERS CHARITY • UNITED WAY TETERBORO AIRPORT 5K RUN • TETERBORO AIRPORT NOISE ABATEMENT ADVISORY GROUP ANNUAL BBQ • AIRPORT WINGS AND WHEELS DAY – 5000 ATTENDEES • AIRPORT CAREER DAY (400 KIDS) • HASBROUCK HEIGHTS HOLIDAY PARADE • TOWN HALL MEETING (CONGRESSMAN ROTHMAN) • SANTA AT THE AVIATION HALL OF FAME (TEB)

  17. NEXT STEPS • PROPOSED POLICY FOR ENGINE STARTUP AND APU RUN. • RESEARCH A NOISE ATTENUATED RUNUP AREA • SECUIRTY HARDENING OF PERIMETER • UPGRADE SECUIRTY BACKGROUD CHECKS • MARKETING AND OUTREACH PROGRAM • COMMUNITY NEWS LETTER • EDUCATE THE INDUSTRY ON OUR COMMUNITY PLEDGE PROGRAM • CONTINUE TO DEVELOP SMS PROGRAMS • KEEP THE MOMENTUM MOVING AHEAD