1 / 9

STATUS OF THE GAS SYSTEM C. Garabatos, GSI

STATUS OF THE GAS SYSTEM C. Garabatos, GSI. Schedule Supermodule infrastructure Back-up system Bubblers. Schedule. 09-10.06 Partial commissioning with Ar and 4-5 supermodules 11.06 Purifier and Membrane modules Closed-loop operation with Ar possible from 12.06

blaze-davis
Download Presentation

STATUS OF THE GAS SYSTEM C. Garabatos, GSI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STATUS OF THE GAS SYSTEMC. Garabatos, GSI Schedule Supermodule infrastructure Back-up system Bubblers

  2. Schedule • 09-10.06 Partial commissioning with Ar and 4-5 supermodules • 11.06 Purifier and Membrane modules • Closed-loop operation with Ar possible from 12.06 • 04.07 Full commissioning with Xe, analysis, recovery • Recovery plant lost! C. Garabatos, GSI

  3. On-detector hardware C. Garabatos, GSI

  4. First ideas (B.W.) Working on it... C. Garabatos, GSI

  5. The CO2 back-up system • Cumbersome, fires rarely, not écolo (~100 l/h continuous CO2 flow) • Decided to keep it anyway (O2) • Replace CO2 by N2 ? • ... C. Garabatos, GSI

  6. Concerns with bubblers • Bubblers produce pressure fluctuations of several mbar • Bubblers may produce an increasing overpressure with increasing flow (~10 l/h) • Bubblers may spill oil into the detector • Design our own! C. Garabatos, GSI

  7. Dynamics of pressure waves C. Garabatos, GSI

  8. 2nd prototype: many small holes • 1.5 mm holes • Should be perfectly aligned • Thin holes • Extra horizontal grid • Small and simple • Thanks to Aramark! C. Garabatos, GSI

  9. Performance Expect improvements with 3rd, professional prototype C. Garabatos, GSI

More Related