1 / 57

Uganda Breweries Ltd. In-plant Water CP-assesment Final presentation

Agenda. PresentationThe UN assignmentCleaner Production Assesment MethodologyPre AssesmentOverall Material BalanceAudit tool based on process flow chart for waterWater costingFocus areas AssesmentInterviews ? who, how and whatManagement and TrainingPackagingBeer ProcessingConclusio

blaze
Download Presentation

Uganda Breweries Ltd. In-plant Water CP-assesment Final presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Uganda Breweries Ltd. In-plant Water CP-assesment Final presentation January 25th 2007 Richard Harrow & Steffen Wissing Danbrew

    2. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    3. Danbrew Ltd. Design and build Breweries Tender for plant developments Investment strategies and plans for breweries Optimising of Breweries 25 years of consultancy in the brewing industry Nearly 100 million hl design/build in more than 60 Countries including 7 African countries 60 consultants working in 7 countries presently

    4. Project organisation for Uganda Breweries CP water assesment Nile Brewery Operations Director Mumbi Muiruri Engineering manager, Bardsley Msagha, Utilities manager, Matthew Mungai Head of Quality & Environment, Mrs. Agnes Acom. Danbrew Senior Consultant Richard Harrow Senior Consultant Steffen Wissing UN Programme Manager Niclas Svenningsen UCPC Technical Officer Patrick Mwesigye

    5. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    6. The assignment of Danbrew UN Environmental Programme have asked Danbrew to perform In-Plant CP-assessments with a focus on water saving and waste water. This is part of the UN water saving initiative within the African brewery sector (The Abrew project). This project will Identify the potential for water savings in the African brewery sector and suggest solutions. Develop a UN project for external funding for implementing water conservation measures in the brewing sector and subsequently in the entire beverage sector in Africa. The preliminary assumption of the project is that water usage is 32 hl water per 1 hl beer. If so the water saving potential is 1.7 billion hl. l Cleaner Production methods are assumed to generate savings of 20 to 50%.

    7. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    8. Cleaner Production The purpose of Cleaner Production is to reduce resource consumption and emissions from a production. Preferably by reduction of waste at source.

    9. Solutions within the CP No part of the solution must be seen isolated

    10. High consumption breweries and the CP High Consumption Breweries can immediately achieve substantial reduction by addressing management issues and small changes in ancillary operations

    11. Low consumption breweries and the CP Low Consumption Breweries need to begin focusing on all three functional groups in detail

    12. Low consumption breweries and the CP Low Consumption Breweries need to begin focusing on al three functional groups in detail

    13. Low consumption breweries and the CP High Consumption Breweries

    14. Cleaner Production Focus Areas

    15. UN CP assesment UNEP Technical report N 33 p. 101 Environmental Management in the Brewing Industry Abrew water assesment

    16. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    17. Material Balance for a Typical Brewery High Consumption

    18. Material Balance for a Typical Brewery Low Consumption

    19. Water balance for Uganda Brewery Medium Water Consumption and Low pollution

    20. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    21. Water Flow for Uganda Breweries

    22. Schematic Layout of a brewery

    23. Schematic Layout of Uganda Breweries

    24. Water flow of Uganda Breweries

    25. UN CP Brewery detailed water balance model

    26. Detailed Water Balance of Uganda Breweries, March 06

    27. Detailed Water Balance of Uganda Breweries, December 06

    29. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    30. Principle of water costing

    31. Water cost calculation of UBL 1/2

    32. Water cost calculation of UBL 2/2

    33. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    34. Focus areas of Uganda Brewery

    35. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    36. Organisation of Uganda Breweries Partly

    37. Interviews and data collection

    38. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    39. Management & training Going on Utility manager is responsible for Water Consumption Follow up is done monthly by Utility Manager and I being supported by Operations Director. Targets set by Operations Director based on Benchmarking with in other Diagio sites KPIs is monitored monthly at bill boards round the brewery The aim for water usage in 2007 is less than 7,0. Utility manager risk is job if the target is not accomplished. Planed Meters have been ordered for precise follow up towards Beer Processing and Beer house CP organisation is just been established CP training is planned Danbrew conclusion Good management attention to water consumption Medium number of leakages and overflow that can be improves by CP Packaging has high number of leakages and overflow that can be improved by CP and management attention Water usage should be monitored monthly at bill boards round the brewery as the other KPIs

    42. KPIs on Bill Boards, but no water consumption or waste measurements

    43. Generally need and tidy, but messy in Packaging

    44. Beer losses follows Water losses

    45. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    48. Financial feasibility for new pasteurizer

    49. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    50. High water usage in Beer house No major issues discovered during assesment. The high uses might very well be a measuring problem since Beer processing and Beerhouse together is 3,4 and the low consumption ratio is 2,9. Improvement of metering is suggested.

    51. Excess Yeast Beer Recovery

    52. Leak at Brewhouse Steam leak of brewhouse recognised it will take 2 month to repair due to spare parts have to be imported from Sparex, UK Suggestion is to use spare part company that has parts on stock the parts will be here within 3 days. Such company exists in Denmark.

    53. Agenda Presentation The UN assignment Cleaner Production Assesment Methodology Pre Assesment Overall Material Balance Audit tool based on process flow chart for water Water costing Focus areas Assesment Interviews who, how and what Management and Training Packaging Beer Processing Conclusion and Next Steps

    54. Discovered focus areas of the brewery

    55. Conclusions of UBL Water CP Assesment Theoretical potential saving of more than than 3 m hl/year or 30% but there is a large potential of waste reduction. UN assumption of African breweries using 32 hl water per hl Beer can not be confirmed UN assumption of savings 20 to 50% can be confirmed. CP assumption of gaining large effects by addressing management and procedures not having to invest heavily in equipment can be applied to UBL.

    56. Next Steps Concluding the assessments Finalise the CP assesment tool Submit to UBL

More Related