1 / 9

TAMDAR Update & Future Plans GLFE and GLOE Meeting August 24-25, 2005

TAMDAR Update & Future Plans GLFE and GLOE Meeting August 24-25, 2005. Taumi Daniels (757) 864-4659 taumi.daniels@nasa.gov. Great Lakes Flight Experiment. GLFE Status. Start date 1/15/2005 As of 8/24, ~3.7 M observations 63 aircraft equipped Changes in observation intervals

bmacaulay
Download Presentation

TAMDAR Update & Future Plans GLFE and GLOE Meeting August 24-25, 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TAMDARUpdate & Future PlansGLFE and GLOEMeetingAugust 24-25, 2005 Taumi Daniels (757) 864-4659 taumi.daniels@nasa.gov

  2. Great Lakes Flight Experiment

  3. GLFE Status • Start date 1/15/2005 • As of 8/24, ~3.7 M observations • 63 aircraft equipped • Changes in observation intervals • Fall & Winter seasons • Targets of opportunity

  4. Current / Planned Activities • GLFE / GLOE • Memphis Deployment • Turbulence Flights • TAMDAR Symposium • Final Reports : • CIMSS, NCAR, & FSL CIMMS Aeribago

  5. GLFE Extension • FAA FISDL funding • “Great Lakes Operational Evaluation” • Continuation of GLFE • Four new Weather studies: • Current Icing Potential • Convective Precipitation • Precipitation Forecast Model Skill • Surface Temperature Model Skill

  6. TAMDAR Schedule • 01/05 – Initiate GLFE • 03/05 – Status Meeting • 03/05 – CIMSS Memphis Deployment • 05/05 – CIMSS Second Deployment • 06/05 – UND Turbulence flights • 07/05 – GLFE ends, GLOE begin • 08/05 – Status Meeting • 09/05 – WxAP Annual Review • 01/06 – GLOE ends • 01/06 – AMS Annual Meeting • 03/06 – FSL Final Report

  7. Future NASA Plans

  8. Future Efforts • Development and evaluation of TAMDAR-derived uplinked weather products for flight deck display • Human Factors / cockpit display studies • Pilot utilization • FAA certification for flight deck display of own-ship turbulence and icing • FAA Collaborations • FISDL, AWRP, SF21, Tech Center • New / updated aviation wx products • Development and demonstration flights of HAZMETs via FISDL and/or Safe Flight 21 datalinks • TAMDAR on UAVs • Icing-only sensor

  9. Future Efforts • Development and evaluation electronic PIREPS (derived from TAMDAR data) for GA pilots • Integration of TAMDAR with other systems for regional aircraft, evaluation, flight testing, certification • Development of FSS user requirements • Evaluation of Electronic PIREPS disseminated to flight service stations and weather briefers • TAMDAR-derived data display issues and collaborative weather decision making • Development of regional aviation weather products from mesoscale models that feature reduced grid spacing and cycle time (ingest TAMDAR data) at AWC • Evaluation of products at AWC on N-AWIPS

More Related