1 / 6

SAFER WP6: Dissemination of Results and End-Users Interface

SAFER WP6: Dissemination of Results and End-Users Interface. Lead Partner NOA, Athens Contributing partners: GFZ, AMRA, Cedim AG and all partners. WP6.1: Dissemination of results. Establishemnt of a web site structured and managed by AMRA (www.saferproject.net) Steadily updated

bo-reeves
Download Presentation

SAFER WP6: Dissemination of Results and End-Users Interface

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAFER WP6: Dissemination of Results and End-Users Interface Lead Partner NOA, Athens Contributing partners: GFZ, AMRA, Cedim AG and all partners

  2. WP6.1:Dissemination of results • Establishemnt of a web site structured and managed by AMRA (www.saferproject.net) • Steadily updated • Currently there are 30 SAFER publications, expected to increase • 20 presentations • 15 technical articles • A long-number of deliverables in the reserved area

  3. WP6.1:Dissemination of results • Production of an informative SAFER brochure. • Preparation of a special booklet about the main achievements in the 5 test-areas. • Schedule to publish a special book on seismic early warning, of international standards (Springer), based mainly on SAFER results.

  4. WP6.2:Interface with end users • Creation of an End Users Group (EUG) with representatives from the SAFER test-sites • EUG special meetings and discussions organized within the frame of the annual general SAFER meetings • Production of a special report about the status of civil protection as regards seismic early warning (prepared by NOA).

  5. WP6.3: Production of a Dynamic Decision Support Module: DDSM • General software frame of a DDSM for scenario simulation andrapid response (Cedim AG) • In detail test and assessment of the DDSM`s operationalcapabilities for at least one of the above cities (CedimAG): the Cairo case

  6. WP6.4: Synergy with other EU funded projects • Contineous update and contact with other relevant EU projects running in parallel to SAFER. • Representatives attend SAFER and vice-versa • EU-Projects: NERIES, TRANSFER, SEAHELLARC etc. • USA-Project: CSEP (SAFER WP5).

More Related