An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Linking ABC/M to Strategic Plans, GPRA, and DOI Bureau of Indian Affairs February 25,2003

  2. Linking ABC/M to Strategic Plans, GPRA, and DOI • The ABC/M initiative for the BIA was designed with the ability to expand the effort in future years to include linkages to strategic plans, GPRA reporting and the DOI cost management effort • Each of these can be accomplished through a number of various avenues including: • Oros modeler software (utilizing the strategy module) • GT developed reporting tool (utilizing attributes) • Bureau reporting matrix

  3. Example 1: Oros Scorecard Module • The existing Oros Modeler software that BIA currently owns, provides the capability to link Activities (organized by Business Lines) and Cost Objects (the outputs) to a Scorecard view of the organization utilizing the Strategy Module • This scorecard view can contain information related to the strategic plan, GPRA reporting, and even the DOI-level effort • Linkages will show both cost and performance data

  4. Example 1:Sample Oros Scorecard Module with Potential Columns

  5. Example 2: GT Developed Reporting Tool* • Used to report activity costs by business line and/or region using a series of attributes • Reports include: • Attributes by Business Line by Region • Attributes Across Business Lines by Region • Business Line by Region • Can be modified to include attributes linking activities/processes to GPRA, etc. *Developed in Microsoft Access

  6. Example 2: GT Developed Reporting Tool

  7. Example 3: Bureau Matrix • Used to provide a “crosswalk” between DOI Outcome Goals and Strategies and Bureau Outputs and Strategies • Shows which activities in the ABC model support the intersection of which goals and outputs • Provides the capability to identify the cost of supporting each output, strategy, and each outcome • Currently in use at Mineral Management Service

  8. Example 3: Bureau Matrix

  9. Conclusion/Questions • The BIA effort is currently in line with the efforts taking place at the Department level, with additional functionality • The BIA chosen software (Oros Modeler) is fully capable of handling the Bureau’s needs into the foreseeable future • Oros Modeler is easily integrated (forward and reverse) to accommodate requirements from the Department level • Oros Modeler is the leader in ABC software currently utilized in the Public Sector • The BIA ABC/M effort can fully integrate into other cost management/performance initiatives (GPRA, etc.)