1 / 12

Delmax , LLC

Delmax, LLC invites investors/partners to cooperate in the implementation of a manufacturing base for production of construction products in Dzerzhinsk, Belarus. The base offers convenient location, railway branch, entry roads, utilities, and the possibility to reorient production. Available land plots and existing buildings ensure a smooth start of production. Partnership or complete sale options available.

boser
Download Presentation

Delmax , LLC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Delmax, LLC Manufacturing base for production of construction products located at Fominykh str., Dzerzhinsk city Minsk region 2018

  2. Investment offer We invite investors/partners to cooperate with for the purposes of project implementation concerning building of manufacturing base for production of construction products and farther start of production within the territory of Dzerzhinsk city, Minsk region, Republic of Belarus. Interaction types: Partnership / Complete sale Benefits and advantages of manufacturing base: - Convenient location; - Railway branch inside the territory of the base; - 2 entry roads (possibility of roundabout); - All utilities at a site, artesian well; - Possibility of reorientation for any production; - Possibility to enlarge land plot area; - Absence of any encumbrances from the side of the state.

  3. Location Delmax, LLC manufacturing base is located in 2 km from M1 highway «Brest – Minsk – Moscow»,in industrial area of Dzerzhinsk city, close to the entrance to the city, has convenient entrance both for light vehicles and trucks. Bus station and “Koydanovo” railroad station are nearby. Land plots for building of manufacturing base Land plot – 1,5989 ha Land plot – 1,3698 ha Land plot – 0,2286 ha- reconstruction and maintenance of railway track. Total area of land plots - 3,2 ha Loan agreement for up to October 2022

  4. Overview (objects layout) Administrative and amenity building, manufacturing building, warehouse unit, waste water treatment unit, boiler plant, parking garage, transformer substation, parking place for trucks, recreation area, parking space. Transformer sub-stantion (built) PTPB-630/10/0,4 Garage (built) S – 864 sq.m. Warehouse unit S – 2215 sq.m. Boiler plant S – 42 sq.m. Manufacturing building (made 0 cycle) S – 2663 sq.m. Present railroad track • Administrative and amenity building (built) S - 1080 sq.m. Building license, ready building project, all approvals are on hand.

  5. Administrative and amenity building (built) • Two story building, dimensions 36,4 m. х 12 m. х 7,2 m., floor height -3 m., floor area 720 m2, basement space -360 m2. Equipped with electrical supply, water supply, canalization, ventilation. External walls are made from cinder blocks with thermal rock-face, low-slope roof, foundation is made of cast reinforced concrete on piles. Interior finishing is partially fulfilled, doors and two-chambered PVC windows are adjusted.

  6. Manufacturing building Manufacturing one-story building, dimensions 72m.х36m.х7,2m., equipped with electrical supply, water supply, canalization, ventilation, heating, under hung overhead-traveling cranes – 3,2 t. External walls are made from cinder blocks with thermal rock-face, foundation is made of cast reinforced concrete. 0 work cycle is carried out: pile field is adjusted, cast-in place reinforcing belt is flooded, backfilling of foundation is done.

  7. Garage-parking (put into operation in 2015) Manufacturing one-story building, dimensions 48m.х18m.х7,4m., equipped with electrical supply, water supply, canalization, ventilation, fire alarm system. Walls are made from cinder blocks, round and even roof made of profile metal plate with heat insulation. Gates – metal roll-up doors, height – 4,8 m. – 8 units, 2 repair pits, length 13 m., filling concrete floor, turn around area for cars. Can be used for storage and processing of different freights, car parking area, organization of service station for light vehicles and trucks.

  8. Warehouse. Boiler-house (designed) Manufacturing one-story building, dimensions 120m.х18m.х9,8m., equipped with electrical supply, water supply, canalization, ventilation, heating system, hanging lifting crane, capability 3,2 t., height up to base of roof truss – 7,2 m. Round and even roof made of profile metal plate with heat insulation. Hard surface tote road. Boiler-house- one-story building, dimensions 6,3m.х7,3m.х4,5m. Attached to gable façade of warehouse. Intended for heating, ventilation and hot water supply of manufacturing base, main fuel – natural gas, heat carrier – water.

  9. Batching plant Compressor unitS – 43m2 silage cement - 2 un. Planetary mixer TEKA capacity 1875 l. Dispensers for inert materials – 3 un. Dispensers for liquid materials – 2 un. Automatized management system over a dispatch room S - 25 m2. Facility readiness– 90%, Start-up and commissioning is left

  10. Transformer sub-station (built, put into operation– 2015) • Modular integrated transformer sub-station in concrete shell • MITS- 630/10/0,4  • Voltage HV - 10 kV; • Voltage LV - 0,4 kV; • Capacity of adjusted power transformer - 150 kW. Territory of manufacturing base is fenced, access railroad branch with uploading platform for uploading and loading of railway vehicles, stepped up railway track is designed.

  11. Delmax, LLC has received certificate of compliance for exercise of the functions of customer/construction customer, delivery of engineering services in the construction industry of 3rd category. Certificate of compliance for exercise of the functions of prime contractor of 4th category. Certificates of compliance for all types of construction works. Delmax, LLC has certified in the Republic of Belarus technology for production of cinder blocks. Wholly owned production line for cinder blocks allows to produce blocks of different size and density 500 kg/m3. In 2011 at the expenses of Delmax, LLC detailed exploration of sand deposits “Ryzhampol’” located at Dzerzhinsk district, Minsk region was carried out. Sand deposits “Ryzhampol’” in total 200 th.m.3 were included in the state balance sheet of recourses of Delmax, LLC . In 2011 at the expenses of Delmax, LLC detailed exploration of sand and gravel mix and sand deposits “Mazury” located at Dzerzhinsk district, Minsk region was carried out. Sand and gravel mix and sanddeposits “Mazury” in total 850,0 th.m.3 were included in the state balance sheet of mineral deposits of Delmax, LLC. Explored field is located 3 km from Fanipol’ city, 20 km from MKAD, 3 km from MKAD-2.

  12. Contacts: Limited liability company «Delmax» 222724 Republic of Belarus, Minsk region, Dzerzhinskiy district, Grichino village Post adress: 222720, Minsk region, Dzerzhinsk city,box 63 Tel./fax8 (017-16) 5-15-63 ShuliginEvgeniyPetrovcih+ 375 29 607- 65 - 52 Odinkina Yana Evgenievna+375 29 394 - 02 - 28 E-mail: Aliska1902@mail.ru

More Related