Fluvial Criteria in the FAHP

Fluvial Criteria in the FAHP. “ All permanent stream crossing replacements must provide for a fully functional floodplain”. The OTIA III Fluvial Performance Standard. Allow normative physical processes within the stream-floodplain corridor. . “Normative Functions”.

bowen
Download Presentation

Fluvial Criteria in the FAHP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fluvial Criteria in the FAHP

  2. “All permanent stream crossing replacements must provide for a fully functional floodplain”

  3. The OTIA III Fluvial Performance Standard Allow normative physical processes within the stream-floodplain corridor.

  4. “Normative Functions” Connectivity with the floodplain: Normal flow paths and depths during common flood events Allow some lateral movement of the channel Maintain sediment transport and debris movmement for common events. Important habitat features (spawning beds, refuges) preserved.

  5. Span the Functional Floodplain What is the Functional Floodplain? Rosgen’s “flood prone area” used to define the “Functional Floodplain”

  6. The Functional Floodplain 2.2 times the Bankfull Width if the Entrenchment Ratio is > 2.2 or The width of the Floodprone area if the Entrenchment Ratio is <2.2

  7. Fully Functional Floodplains Made Easy • No Piers? The opening needs to be 1.5 x Active Channel width • Piers? Then the opening needs to be 2.2 x the Active Channel width These are the widths for permit compliance. Hydraulic considerations may result in wider openings.

  8. Incised stream channel

  9. More openings • Install relief conduits, as necessary, within existing road fill at potential flood flow pathways

  10. Remove remnant piers and fill

  11. Protecting Abutments: Staying outside the scour prism

  12. What if the “Fluvial Design Criteria” isn’t practical?

  13. Sometimes it just doesn’t make sense Hillslope constrained

  14. Built environment

  15. Estuarine or Large River Delta

  16. Coordinate with NMFS!

  17. What Triggers Mitigation?Encroachment into the General Scour Prism

  18. Off-setting for Scour Prism Encroachment Artificial Floodplain fill Old Wooden Piles Berm Removal Old Bridge Supports Concrete Chunks Unnecessary riprap